90
IBM® Netfinity® 7100 User’s Reference
Refer to the following illustration when installing a hot-swap power supply.
Note:
The illustrations in this book might differ slightly from your hardware.
To install an additional power supply:
1. Review “Before you begin” on page 66.
2. Remove the filler panel.
3. Place the handle on the power supply in the open position.
4. Slide the power supply into the chassis and close the handle.
5. Plug one end of the power cord into the power supply; then, plug the other end of
the cord into a properly grounded electrical outlet.
6. Verify that the DC power light and the AC power light on the power supply are
lit, indicating that the power supply is operating properly.
Statement 6
CAUTION:
If you install a strain-relief bracket option over the end of the power cord that is
connected to the device, you must connect the other end of the power cord to an
easily accessible power source.
AC power light
DC power light
Handle
Filler panel
Содержание Netfinity 7100
Страница 1: ...IBM IBM Netfinity 7100 User s Reference SC19 K081 10 ...
Страница 2: ......
Страница 3: ...IBM IBM Netfinity 7100 User s Reference SC19 K081 10 ...
Страница 7: ...Contents v Index 183 ...
Страница 8: ...vi IBM Netfinity 7100 User s Reference ...
Страница 13: ...xi Statement 4 18 kg 37 lbs 32 kg 70 5 lbs 55 kg 121 2 lbs CAUTION Use safe practices when lifting ...
Страница 34: ...20 IBM Netfinity 7100 User s Reference ...
Страница 72: ...58 IBM Netfinity 7100 User s Reference ...
Страница 174: ...160 IBM Netfinity 7100 User s Reference ...
Страница 196: ...182 IBM Netfinity 7100 User s Reference ...
Страница 199: ......