Bulk
Power
Distributor
(BPD)
There
can
be
two
BPDs,
located
immediately
above
the
BPC.
If
only
one
BPD
is
required,
an
airflow
baffle
must
installed
in
the
top
BPD
position.
Attention:
This
service
procedure
may
produce
other
power
error
code(s)
(101x
xxxx)
between
the
time
the
Start
Service
button
is
pressed,
and
the
Service
Complete
button
is
pressed,
during
concurrent
repair.
If
normal
system
operation
continues,
as
described
by
this
procedure,
ignore
these
error
codes.
Removal
Attention:
The
BPD
unit
weighs
approximately
2.27
kg
(5
lbs).
1.
Locate
the
BPD
to
be
replaced.
2.
Note
the
state
of
the
BPD
ENBL
(Good)
LED.
3.
Press
the
green
Start
Service
button
on
the
UEPO
switch.
4.
Proceed
only
if
the
ENBL
(Good)
LED
goes
off
or
the
repair
has
been
scheduled.
If
the
repair
has
been
scheduled,
power
off
the
system
as
described
in
then
return
here.
5.
Check
the
ENBL
(Good)
LED
for
all
the
BPRs
(LED
on
right
side
of
FRU)
on
same
BPA
side.
For
each
BPR
that
has
this
LED
in
the
ON
state,
manually
slide
the
power
switches
to
the
right.
Attention:
Do
not
switch
off
units
where
this
LED
is
already
off.
6.
Verify
that
all
cables
are
labeled
for
plug
location
and
then
unplug
the
cables
from
the
BPD.
7.
Loosen
the
left
and
right
fasteners
using
the
torque
tool
(part
number
6422789).
Slide
the
unit
out
of
the
slot.
Replacement
Attention:
Before
proceeding,
make
sure
that
all
the
BPR
ENBL
(Good)
LEDs
are
OFF.
For
each
BPR
that
has
this
LED
in
the
ON
state,
manually
slide
the
power
switches
to
the
right.
Do
not
switch
off
units
where
this
LED
is
already
off.
Attention:
Make
sure
that
the
UEPO
bypass
switch
on
the
BPC
is
in
the
BYPASS
position.
1.
Slowly
slide
the
BPD
into
the
slot
and
carefully
seat
the
BPD
against
the
backplane.
2.
Tighten
the
left
and
right
fasteners
with
the
torque
tool.
3.
Plug
all
cables
to
the
BPD,
ensuring
that
the
plug
location
and
the
cable
label
agree.
4.
Manually
move
any
BPR
power
switches
that
are
to
the
right
(OFF)
position,
to
the
left
(ON)
position.
5.
Move
the
UEPO
bypass
switch
to
the
NORMAL
position.
6.
Press
the
white
Service
Complete
button
on
the
UEPO
switch
to
indicate
completion
of
this
procedure.
The
BPA
automatically
configures
as
it
powers
on.
7.
If
a
high
performance
switch
is
installed
in
or
attached
to
the
system,
perform
the
steps
described
in
to
insure
that
the
new
BPD
contains
the
correct
code.
Chapter
9.
Removal
and
Replacement
Procedures
863
Содержание eserver pSeries 690
Страница 1: ...pSeries 690 Service Guide SA38 0589 05 ERserver...
Страница 2: ......
Страница 3: ...pSeries 690 Service Guide SA38 0589 05 ERserver...
Страница 12: ...x Eserver pSeries 690 Service Guide...
Страница 14: ...xii Eserver pSeries 690 Service Guide...
Страница 228: ...Step 1527 5 Call your next level of support 212 Eserver pSeries 690 Service Guide...
Страница 357: ...Step 1543 15 Call for support This ends the procedure Chapter 3 Maintenance Analysis Procedures 341...
Страница 362: ...Step 1545 15 Call for support This ends the procedure 346 Eserver pSeries 690 Service Guide...
Страница 365: ...Step 1546 15 Call for support This ends the procedure Chapter 3 Maintenance Analysis Procedures 349...
Страница 381: ...Step 154A 14 Turn off the power Chapter 3 Maintenance Analysis Procedures 365...
Страница 430: ...414 Eserver pSeries 690 Service Guide...
Страница 798: ...782 Eserver pSeries 690 Service Guide...
Страница 868: ...Media Subsystem Internal Cables 1021 p690 Cable Installation and Management 1022 852 Eserver pSeries 690 Service Guide...
Страница 910: ...MCM Installation Shorts Test Step 3 See L3 Cache Modules on page 898 894 Eserver pSeries 690 Service Guide...
Страница 923: ...L3 Cache Shorts Test Step 4 Chapter 9 Removal and Replacement Procedures 907...
Страница 924: ...L3 Cache Shorts Test Step 5 908 Eserver pSeries 690 Service Guide...
Страница 926: ...L3 Cache Shorts Test Step 2 910 Eserver pSeries 690 Service Guide...
Страница 928: ...L3 Cache Shorts Test Step 4 912 Eserver pSeries 690 Service Guide...
Страница 929: ...L3 Cache Shorts Test Step 5 Chapter 9 Removal and Replacement Procedures 913...
Страница 1055: ...7040 Model 681 Media Subsystem 1 2 3 4 5 6 7 8 9 10 Chapter 10 Parts Information 1039...
Страница 1057: ...Power and SCSI Cables to the Media Subsystem 1 2 3 5 4 6 Chapter 10 Parts Information 1041...
Страница 1061: ...Power Cabling Chapter 10 Parts Information 1045...
Страница 1090: ...1074 Eserver pSeries 690 Service Guide...
Страница 1094: ...1078 Eserver pSeries 690 Service Guide...
Страница 1109: ...error Handle unexpected modem responses expect 8 r or 7 r or 6 r or 4 r or 3 r delay 2 done Appendix D Modem Configurations 1093...
Страница 1122: ...1106 Eserver pSeries 690 Service Guide...
Страница 1123: ...Appendix E Ground Path The ground path for the pSeries 690 is shown in the following figure 1107...
Страница 1124: ...1108 Eserver pSeries 690 Service Guide...
Страница 1132: ...1116 Eserver pSeries 690 Service Guide...
Страница 1133: ......
Страница 1134: ...Printed in U S A February 2004 SA38 0589 05...