then,
power
on
through
either
the
HMC
commands
or
by
physically
toggling
the
power
switch
on
the
node.
Proceed
to
step
to
verify
the
code
has
loaded.
5.
For
a
7026
or
a
7040
with
a
SP
Switch2
PCI
adapter,
do
the
following:
Efence
-p
x
nn
(where
x
is
plane
number
0
or
1
and
nn
is
the
node_number
of
the
server
or
logical
partition)
RESPONSE:
All
nodes
successfully
fenced.
6.
On
the
object
server
or
logical
partition
(or
with
the
dsh
command),
type:
/usr/lpp/ssp/css/ifconfig
css0
down
detach
Note:
In
a
dual-plane
environment,
this
could
be
performed
on
css0,
css1
or
both.
RESPONSE:
driver
unconfig
OK
RESPONSE:
driver
unloaded
7.
On
the
object
server
or
logical
partition
(or
with
the
dsh
command),
type:
stopsrc
-s
hats
RESPONSE:
0513-044
The
hats
subsystem
was
requested
to
stop
8.
stopsrc
-s
hags
RESPONSE:
0513-044
The
hags
subsystem
was
requested
to
stop
9.
7)
/usr/lpp/ssp/css/css_cdn
Note:
This
will
kill
the
fault_service_Worm_RTG_SP
process
on
the
server
or
logical
partition.
10.
/usr/lpp/ssp/css/ucfgcor
-l
css0
(or
css1)
11.
Determine
if
the
SP
Switch2
PCI
Attachment
Adapter
(css0
or
css1)
is
running
any
processes
using
the
following
command:
fuser
/dev/css0
and/or
fuser
/dev/css1
.
Kill
any
processes
that
are
bound
to
the
adapter.
12.
Run
the
following
commands
to
remove
power
to
the
slot
into
which
the
adapter
is
plugged.
This
action
is
necessary
to
activate
the
Xilinx
update.
echo
|
/usr/sbin/drslot
-R
-c
pci
-l
css0
-I
*
echo
|
/usr/sbin/drslot
-R
-c
pci
-l
css1
-I
If
the
previous
command
is
run
using
dsh
from
the
CWS,
quotation
marks
are
required
around
the
entire
command
as
follows:
dsh
"echo
|
/usr/sbin/drslot
-R
-c
pci
-l
css0
-I"
13.
Reboot
the
server
or
logical
partition.
Type:
shutdown
-Fr
14.
When
the
server
or
logical
partition
is
back
up,
from
the
CWS,
type:
Eunfence
-p
x
nn
(where
x
is
plane
0
or
1
and
nn
is
the
node_number
of
the
server
or
logical
partition)
RESPONSE:
All
nodes
successfully
unfenced.
Chapter
9.
Removal
and
Replacement
Procedures
1003
Содержание eserver pSeries 690
Страница 1: ...pSeries 690 Service Guide SA38 0589 05 ERserver...
Страница 2: ......
Страница 3: ...pSeries 690 Service Guide SA38 0589 05 ERserver...
Страница 12: ...x Eserver pSeries 690 Service Guide...
Страница 14: ...xii Eserver pSeries 690 Service Guide...
Страница 228: ...Step 1527 5 Call your next level of support 212 Eserver pSeries 690 Service Guide...
Страница 357: ...Step 1543 15 Call for support This ends the procedure Chapter 3 Maintenance Analysis Procedures 341...
Страница 362: ...Step 1545 15 Call for support This ends the procedure 346 Eserver pSeries 690 Service Guide...
Страница 365: ...Step 1546 15 Call for support This ends the procedure Chapter 3 Maintenance Analysis Procedures 349...
Страница 381: ...Step 154A 14 Turn off the power Chapter 3 Maintenance Analysis Procedures 365...
Страница 430: ...414 Eserver pSeries 690 Service Guide...
Страница 798: ...782 Eserver pSeries 690 Service Guide...
Страница 868: ...Media Subsystem Internal Cables 1021 p690 Cable Installation and Management 1022 852 Eserver pSeries 690 Service Guide...
Страница 910: ...MCM Installation Shorts Test Step 3 See L3 Cache Modules on page 898 894 Eserver pSeries 690 Service Guide...
Страница 923: ...L3 Cache Shorts Test Step 4 Chapter 9 Removal and Replacement Procedures 907...
Страница 924: ...L3 Cache Shorts Test Step 5 908 Eserver pSeries 690 Service Guide...
Страница 926: ...L3 Cache Shorts Test Step 2 910 Eserver pSeries 690 Service Guide...
Страница 928: ...L3 Cache Shorts Test Step 4 912 Eserver pSeries 690 Service Guide...
Страница 929: ...L3 Cache Shorts Test Step 5 Chapter 9 Removal and Replacement Procedures 913...
Страница 1055: ...7040 Model 681 Media Subsystem 1 2 3 4 5 6 7 8 9 10 Chapter 10 Parts Information 1039...
Страница 1057: ...Power and SCSI Cables to the Media Subsystem 1 2 3 5 4 6 Chapter 10 Parts Information 1041...
Страница 1061: ...Power Cabling Chapter 10 Parts Information 1045...
Страница 1090: ...1074 Eserver pSeries 690 Service Guide...
Страница 1094: ...1078 Eserver pSeries 690 Service Guide...
Страница 1109: ...error Handle unexpected modem responses expect 8 r or 7 r or 6 r or 4 r or 3 r delay 2 done Appendix D Modem Configurations 1093...
Страница 1122: ...1106 Eserver pSeries 690 Service Guide...
Страница 1123: ...Appendix E Ground Path The ground path for the pSeries 690 is shown in the following figure 1107...
Страница 1124: ...1108 Eserver pSeries 690 Service Guide...
Страница 1132: ...1116 Eserver pSeries 690 Service Guide...
Страница 1133: ......
Страница 1134: ...Printed in U S A February 2004 SA38 0589 05...