–
Install
one
or
more
foam-block
tailgate
inserts
into
any
open
slot
(refer
to
the
tailgate
illustration
above).
Note:
Do
not
connect
any
HPS
cables
until
instructed
to
do
so.
After
the
preliminary
steps
are
complete:
1.
Sort
the
HPS
cables
into
groups
based
on
SNI
port
location,
but
do
not
clamp
or
connect
cables
until
instructed
to
do
so.
An
overview
of
the
next
few
steps
is
as
follows:
a.
Switch
cables
will
be
clamped
into
the
tailgate
in
groups
of
either
four
or
two.
b.
High
Power
Switch
cables
get
clamped
into
the
next
available
tailgate
slot.
c.
Continue
this
cable
pattern
working
down
the
frame
and
clamping
to
the
right
in
the
tailgate.
2.
Before
routing
the
switch
cables,
position
the
HMC,
Ethernet,
and
I/O
cables
but
do
not
clamp
these
cables
into
the
tailgate
until
instructed
to
do
so.
a.
Route
the
HMC
and
Ethernet
cables
to
the
appropriate
connectors
and
connect
each
cable.
v
If
present,
make
certain
the
HMC
and
Ethernet
cables
do
not
interfere
with
the
SNI
ports.
b.
Wire
tie
the
HMC
and
Ethernet
cables
into
a
bundle
running
down
the
side
of
the
frame.
c.
Wire
tie
any
I/O
cables
into
a
bundle
running
down
the
side
of
the
frame.
3.
If
HPS
cables
are
present,
without
plugging
the
switch
cables
into
the
SNI
ports,
take
the
switch
cables
and
raise
them
into
position.
a.
Check
any
cable
labels
and
verify
that
you
have
the
correct
cables
for
each
SNI
port.
b.
Make
certain
that
the
cable
for
the
upper
SNI
port
extends
further
than
the
cable
for
the
lower
SNI
port.
c.
Place
a
wire
tie
far
enough
down
the
cable
set
so
that
the
cables
will
have
sufficient
length
for
a
gentle
bend
radius.
d.
Wire
tie
the
cables
together.
4.
Clamp
any
HPS
cables
into
the
next
available
tailgate
slot
using
a
rubber-faced,
tailgate
insert
with
the
appropriate
thickness
of
rubber.
5.
If
they
are
used,
clamp
the
I/O
cables
into
the
tailgate
using
tailgate
inserts.
Depending
on
the
number
and
size
of
the
I/O
cables,
you
may
have
to
use
one
or
two
tailgate
slots
and
clamping
inserts.
6.
Clamp
the
HMC
and
Ethernet
cables
into
an
available
tailgate
slot
using
a
tailgate
insert.
7.
Insert
foam-block
tailgate
inserts
into
any
remaining
tailgate
slots.
If
you
have
properly
cabled
the
frame,
the
cable
layout
should
look
like
the
following
illustration.
Chapter
9.
Removal
and
Replacement
Procedures
1025
Содержание eserver pSeries 690
Страница 1: ...pSeries 690 Service Guide SA38 0589 05 ERserver...
Страница 2: ......
Страница 3: ...pSeries 690 Service Guide SA38 0589 05 ERserver...
Страница 12: ...x Eserver pSeries 690 Service Guide...
Страница 14: ...xii Eserver pSeries 690 Service Guide...
Страница 228: ...Step 1527 5 Call your next level of support 212 Eserver pSeries 690 Service Guide...
Страница 357: ...Step 1543 15 Call for support This ends the procedure Chapter 3 Maintenance Analysis Procedures 341...
Страница 362: ...Step 1545 15 Call for support This ends the procedure 346 Eserver pSeries 690 Service Guide...
Страница 365: ...Step 1546 15 Call for support This ends the procedure Chapter 3 Maintenance Analysis Procedures 349...
Страница 381: ...Step 154A 14 Turn off the power Chapter 3 Maintenance Analysis Procedures 365...
Страница 430: ...414 Eserver pSeries 690 Service Guide...
Страница 798: ...782 Eserver pSeries 690 Service Guide...
Страница 868: ...Media Subsystem Internal Cables 1021 p690 Cable Installation and Management 1022 852 Eserver pSeries 690 Service Guide...
Страница 910: ...MCM Installation Shorts Test Step 3 See L3 Cache Modules on page 898 894 Eserver pSeries 690 Service Guide...
Страница 923: ...L3 Cache Shorts Test Step 4 Chapter 9 Removal and Replacement Procedures 907...
Страница 924: ...L3 Cache Shorts Test Step 5 908 Eserver pSeries 690 Service Guide...
Страница 926: ...L3 Cache Shorts Test Step 2 910 Eserver pSeries 690 Service Guide...
Страница 928: ...L3 Cache Shorts Test Step 4 912 Eserver pSeries 690 Service Guide...
Страница 929: ...L3 Cache Shorts Test Step 5 Chapter 9 Removal and Replacement Procedures 913...
Страница 1055: ...7040 Model 681 Media Subsystem 1 2 3 4 5 6 7 8 9 10 Chapter 10 Parts Information 1039...
Страница 1057: ...Power and SCSI Cables to the Media Subsystem 1 2 3 5 4 6 Chapter 10 Parts Information 1041...
Страница 1061: ...Power Cabling Chapter 10 Parts Information 1045...
Страница 1090: ...1074 Eserver pSeries 690 Service Guide...
Страница 1094: ...1078 Eserver pSeries 690 Service Guide...
Страница 1109: ...error Handle unexpected modem responses expect 8 r or 7 r or 6 r or 4 r or 3 r delay 2 done Appendix D Modem Configurations 1093...
Страница 1122: ...1106 Eserver pSeries 690 Service Guide...
Страница 1123: ...Appendix E Ground Path The ground path for the pSeries 690 is shown in the following figure 1107...
Страница 1124: ...1108 Eserver pSeries 690 Service Guide...
Страница 1132: ...1116 Eserver pSeries 690 Service Guide...
Страница 1133: ......
Страница 1134: ...Printed in U S A February 2004 SA38 0589 05...