Replacement
Note:
All
four
bays
in
each
DASD
4-pack
must
be
occupied.
If
a
bay
does
not
have
a
DASD
assembly,
it
must
be
occupied
by
a
filler
assembly.
1.
Inspect
the
DASD
4-pack
to
ensure
it
is
not
damaged.
2.
Ensure
that
the
lower
retaining
screws
are
inserted
and
secured.
3.
Ensure
that
the
front
retaining
screws
are
inserted
and
secured
without
interfering
with
the
DCA.
4.
Open
fully
the
latch
on
the
DASD
assembly
by
pressing
the
blue
handle
and
pulling
the
black
handle.
A
thump
signals
that
it
is
fully
open.
5.
With
the
handle
to
the
bottom,
insert
the
assembly
into
the
appropriate
slot.
6.
Slide
the
assembly
forward
until
you
feel
some
resistance.
Verify
that
the
spring
on
the
top
is
contacting
the
edge
of
the
4-pack.
This
should
be
the
only
resistance.
7.
Push
the
assembly
forward
with
slightly
more
force
until
you
feel
more
resistance.
Verify
that
the
tab
on
the
black
handle
is
located
above
the
cam
slot
in
the
4-pack.
Note:
If
the
tab
is
not
aligned
with
the
slot,
do
not
raise
the
handle.
Remove
the
assembly
and
start
again.
8.
Lift
the
black
handle
to
move
the
assembly
in
slightly.
9.
Lift
the
handle
and
push
forward
until
the
blue
latch
hooks
the
assembly
body.
Chapter
9.
Removal
and
Replacement
Procedures
1011
Содержание eserver pSeries 690
Страница 1: ...pSeries 690 Service Guide SA38 0589 05 ERserver...
Страница 2: ......
Страница 3: ...pSeries 690 Service Guide SA38 0589 05 ERserver...
Страница 12: ...x Eserver pSeries 690 Service Guide...
Страница 14: ...xii Eserver pSeries 690 Service Guide...
Страница 228: ...Step 1527 5 Call your next level of support 212 Eserver pSeries 690 Service Guide...
Страница 357: ...Step 1543 15 Call for support This ends the procedure Chapter 3 Maintenance Analysis Procedures 341...
Страница 362: ...Step 1545 15 Call for support This ends the procedure 346 Eserver pSeries 690 Service Guide...
Страница 365: ...Step 1546 15 Call for support This ends the procedure Chapter 3 Maintenance Analysis Procedures 349...
Страница 381: ...Step 154A 14 Turn off the power Chapter 3 Maintenance Analysis Procedures 365...
Страница 430: ...414 Eserver pSeries 690 Service Guide...
Страница 798: ...782 Eserver pSeries 690 Service Guide...
Страница 868: ...Media Subsystem Internal Cables 1021 p690 Cable Installation and Management 1022 852 Eserver pSeries 690 Service Guide...
Страница 910: ...MCM Installation Shorts Test Step 3 See L3 Cache Modules on page 898 894 Eserver pSeries 690 Service Guide...
Страница 923: ...L3 Cache Shorts Test Step 4 Chapter 9 Removal and Replacement Procedures 907...
Страница 924: ...L3 Cache Shorts Test Step 5 908 Eserver pSeries 690 Service Guide...
Страница 926: ...L3 Cache Shorts Test Step 2 910 Eserver pSeries 690 Service Guide...
Страница 928: ...L3 Cache Shorts Test Step 4 912 Eserver pSeries 690 Service Guide...
Страница 929: ...L3 Cache Shorts Test Step 5 Chapter 9 Removal and Replacement Procedures 913...
Страница 1055: ...7040 Model 681 Media Subsystem 1 2 3 4 5 6 7 8 9 10 Chapter 10 Parts Information 1039...
Страница 1057: ...Power and SCSI Cables to the Media Subsystem 1 2 3 5 4 6 Chapter 10 Parts Information 1041...
Страница 1061: ...Power Cabling Chapter 10 Parts Information 1045...
Страница 1090: ...1074 Eserver pSeries 690 Service Guide...
Страница 1094: ...1078 Eserver pSeries 690 Service Guide...
Страница 1109: ...error Handle unexpected modem responses expect 8 r or 7 r or 6 r or 4 r or 3 r delay 2 done Appendix D Modem Configurations 1093...
Страница 1122: ...1106 Eserver pSeries 690 Service Guide...
Страница 1123: ...Appendix E Ground Path The ground path for the pSeries 690 is shown in the following figure 1107...
Страница 1124: ...1108 Eserver pSeries 690 Service Guide...
Страница 1132: ...1116 Eserver pSeries 690 Service Guide...
Страница 1133: ......
Страница 1134: ...Printed in U S A February 2004 SA38 0589 05...