
To install the frame, do the following:
Attention:
It is the service representative’s responsibility to complete the following
steps.
1. Before starting the installation, check all cable openings in the floor panel and
location of the rubber bushing holes so that they match the dimensions given in
the following illustrations.
654.8 mm
654.8 mm
(4x) 450 mm REF
(8) x 49.3 mm
Eyebolts
(4X)
75
mm
REF
610 mm REF
(4X)
170
mm
REF
2440 mm REF
1019
mm
64.6 mm
64.6 mm
100.5
mm
24 Inch Floor Tile Layout
(4) Opening for Cables
24 in REF
96 in REF
54
Eserver
pSeries 690 Installation Guide
Содержание eserver pSeries 690
Страница 1: ...pSeries 690 Installation Guide SA38 0587 02 ERserver IBM...
Страница 2: ......
Страница 3: ...pSeries 690 Installation Guide SA38 0587 02 ERserver IBM...
Страница 12: ...x Eserver pSeries 690 Installation Guide...
Страница 14: ...xii Eserver pSeries 690 Installation Guide...
Страница 50: ...34 Eserver pSeries 690 Installation Guide...
Страница 54: ...38 Eserver pSeries 690 Installation Guide...
Страница 58: ...42 Eserver pSeries 690 Installation Guide...
Страница 74: ...58 Eserver pSeries 690 Installation Guide...
Страница 90: ...74 Eserver pSeries 690 Installation Guide...
Страница 108: ...92 Eserver pSeries 690 Installation Guide...
Страница 112: ...96 Eserver pSeries 690 Installation Guide...
Страница 117: ...1 2 3 1 Jam Nut 3 Rack Base 2 Leveling Foot Appendix J Removing and Installing the Rack Top Frame 101...
Страница 134: ...118 Eserver pSeries 690 Installation Guide...
Страница 138: ...122 Eserver pSeries 690 Installation Guide...
Страница 141: ......
Страница 142: ...IBMR Printed in U S A October 2002 SA38 0587 02...