Install the Front Door .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 25
Install the Rear Door .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 25
Proceed to Verifying the Hardware Operation .
.
.
.
.
.
.
.
.
.
.
.
.
. 26
Chapter 3. Verifying the Hardware Operation .
.
.
.
.
.
.
.
.
.
.
.
. 27
Considerations Before Running This Procedure .
.
.
.
.
.
.
.
.
.
.
.
. 27
Power On the System
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 27
HMC Power-On
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 27
Media Subsystem Operator Panel Power-On .
.
.
.
.
.
.
.
.
.
.
.
. 29
Loading the Online Diagnostics in Service Mode
.
.
.
.
.
.
.
.
.
.
.
. 29
Loading the Standalone Diagnostics from CD-ROM.
.
.
.
.
.
.
.
.
.
.
. 30
Running System Verification
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 31
Performing Additional System Verification .
.
.
.
.
.
.
.
.
.
.
.
.
.
. 32
Stopping the Diagnostics
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 32
Ensure that the Latest Firmware, HMC Code and Adapter/Drive Microcode are
Installed .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 32
Completing the Installation .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 32
Complete System Records and Installation Procedure .
.
.
.
.
.
.
.
.
. 33
Refer to the
IBM Hardware Management Console for pSeries Installation and
Operations Guide to Configure the Network
.
.
.
.
.
.
.
.
.
.
.
. 33
Leave this Document with your Customer .
.
.
.
.
.
.
.
.
.
.
.
.
.
. 33
Appendix A. Communications Statements .
.
.
.
.
.
.
.
.
.
.
.
.
. 35
Federal Communications Commission (FCC) Statement .
.
.
.
.
.
.
.
.
. 35
European Union (EU) Statement .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 35
International Electrotechnical Commission (IEC) Statement .
.
.
.
.
.
.
.
. 36
United Kingdom Telecommunications Safety Requirements .
.
.
.
.
.
.
.
. 36
Avis de conformité aux normes du ministère des Communications du Canada .
.
. 36
Canadian Department of Communications Compliance Statement .
.
.
.
.
.
. 36
VCCI Statement
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 36
Electromagnetic Interference (EMI) Statement - Taiwan
.
.
.
.
.
.
.
.
.
. 37
Radio Protection for Germany .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 37
Appendix B. Environmental Notices .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 39
Product Recycling and Disposal .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 39
Environmental Design
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 39
Acoustical Noise Emissions
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 40
Declared Acoustical Noise Emissions
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 40
Appendix C. Notices
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 41
Appendix D. Securing the Rack
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 43
Positioning the Rack .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 43
Installing the Frame Kit .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 43
Rack Tie-Down Kits .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 43
Mounting Internal Rack Components
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 45
Determine Your Next Step .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. 46
Attach the Rack to a Concrete (Non-Raised) Floor .
.
.
.
.
.
.
.
.
.
.
. 48
Attaching the Rack to a Short-Raised or Long-Raised Floor .
.
.
.
.
.
.
.
. 52
iv
Eserver
pSeries 690 Installation Guide
Содержание eserver pSeries 690
Страница 1: ...pSeries 690 Installation Guide SA38 0587 02 ERserver IBM...
Страница 2: ......
Страница 3: ...pSeries 690 Installation Guide SA38 0587 02 ERserver IBM...
Страница 12: ...x Eserver pSeries 690 Installation Guide...
Страница 14: ...xii Eserver pSeries 690 Installation Guide...
Страница 50: ...34 Eserver pSeries 690 Installation Guide...
Страница 54: ...38 Eserver pSeries 690 Installation Guide...
Страница 58: ...42 Eserver pSeries 690 Installation Guide...
Страница 74: ...58 Eserver pSeries 690 Installation Guide...
Страница 90: ...74 Eserver pSeries 690 Installation Guide...
Страница 108: ...92 Eserver pSeries 690 Installation Guide...
Страница 112: ...96 Eserver pSeries 690 Installation Guide...
Страница 117: ...1 2 3 1 Jam Nut 3 Rack Base 2 Leveling Foot Appendix J Removing and Installing the Rack Top Frame 101...
Страница 134: ...118 Eserver pSeries 690 Installation Guide...
Страница 138: ...122 Eserver pSeries 690 Installation Guide...
Страница 141: ......
Страница 142: ...IBMR Printed in U S A October 2002 SA38 0587 02...