I/O Subsystems (1 through 3 with IBFs) RIO Cabling to I/O Books
A0
C0
A1
C1
B0
0
0
0
0
0
0
1
1
4
3
5
6
1
1
1
1
B1
1
2
1
Primary Rack
A0
Connection to I/O Book (Book 0)
2
Primary I/O Book
A1
Connection to I/O Book (Book 0)
3
Third I/O Subsystem
B0
Connection to I/O Book (Book 0)
4
Second I/O Subsystem
B1
Connection to I/O Book (Book 0)
5
First I/O Subsystem
C0
Connection to I/O Book (Book 2)
6
Secondary I/O Book
C1
Connection to I/O Book (Book 2)
82
Eserver
pSeries 690 Installation Guide
Содержание eserver pSeries 690
Страница 1: ...pSeries 690 Installation Guide SA38 0587 02 ERserver IBM...
Страница 2: ......
Страница 3: ...pSeries 690 Installation Guide SA38 0587 02 ERserver IBM...
Страница 12: ...x Eserver pSeries 690 Installation Guide...
Страница 14: ...xii Eserver pSeries 690 Installation Guide...
Страница 50: ...34 Eserver pSeries 690 Installation Guide...
Страница 54: ...38 Eserver pSeries 690 Installation Guide...
Страница 58: ...42 Eserver pSeries 690 Installation Guide...
Страница 74: ...58 Eserver pSeries 690 Installation Guide...
Страница 90: ...74 Eserver pSeries 690 Installation Guide...
Страница 108: ...92 Eserver pSeries 690 Installation Guide...
Страница 112: ...96 Eserver pSeries 690 Installation Guide...
Страница 117: ...1 2 3 1 Jam Nut 3 Rack Base 2 Leveling Foot Appendix J Removing and Installing the Rack Top Frame 101...
Страница 134: ...118 Eserver pSeries 690 Installation Guide...
Страница 138: ...122 Eserver pSeries 690 Installation Guide...
Страница 141: ......
Страница 142: ...IBMR Printed in U S A October 2002 SA38 0587 02...