I/O Subsystems (7 and 8) RIO Cabling to the Third I/O Book
0
C1
C2
C3
5
3
2
1
4B
4B
6
4
7
0
8
C0
C1
D0
D1
Shown with IBFs
C1
Primary Rack
4
Fourth I/O Subsystem
C2
Secondary Rack
4B
Two IBFs (maximum), Position 4
C3
Third I/O Book (Book 3)
5
Fifth I/O Subsystem
1
First I/O Subsystem
6
Sixth I/O Subsystem
2
Second I/O Subsystem
7
Seventh I/O Subsystem
3
Third I/O Subsystem
8
Eighth I/O Subsystem
Note: RIO cabling to I/O subsystems 7 and 8 is the same for configurations with or without the
IBFs.
Appendix G. Subsystem Positioning and Cabling
81
Содержание eserver pSeries 690
Страница 1: ...pSeries 690 Installation Guide SA38 0587 02 ERserver IBM...
Страница 2: ......
Страница 3: ...pSeries 690 Installation Guide SA38 0587 02 ERserver IBM...
Страница 12: ...x Eserver pSeries 690 Installation Guide...
Страница 14: ...xii Eserver pSeries 690 Installation Guide...
Страница 50: ...34 Eserver pSeries 690 Installation Guide...
Страница 54: ...38 Eserver pSeries 690 Installation Guide...
Страница 58: ...42 Eserver pSeries 690 Installation Guide...
Страница 74: ...58 Eserver pSeries 690 Installation Guide...
Страница 90: ...74 Eserver pSeries 690 Installation Guide...
Страница 108: ...92 Eserver pSeries 690 Installation Guide...
Страница 112: ...96 Eserver pSeries 690 Installation Guide...
Страница 117: ...1 2 3 1 Jam Nut 3 Rack Base 2 Leveling Foot Appendix J Removing and Installing the Rack Top Frame 101...
Страница 134: ...118 Eserver pSeries 690 Installation Guide...
Страница 138: ...122 Eserver pSeries 690 Installation Guide...
Страница 141: ......
Страница 142: ...IBMR Printed in U S A October 2002 SA38 0587 02...