2. Simultaneously slide the top and bottom hinge pins (1) on the rear door into the top
and bottom hinges (2) on the rack.
3. Close the rear door and engage the latch on the left side of the door.
1
1
1
1
2
2
2
3
4
2
1 Hinge Pin (Typical Front and
Rear Door)
3
Front Door
2 Rack Hinge (Typical Front and
Rear Door)
4
Rear Door
Proceed to Verifying the Hardware Operation
The installation of the pSeries 690 is now complete. Proceed to Chapter 3, “Verifying
the Hardware Operation” on page 27.
26
Eserver
pSeries 690 Installation Guide
Содержание eserver pSeries 690
Страница 1: ...pSeries 690 Installation Guide SA38 0587 02 ERserver IBM...
Страница 2: ......
Страница 3: ...pSeries 690 Installation Guide SA38 0587 02 ERserver IBM...
Страница 12: ...x Eserver pSeries 690 Installation Guide...
Страница 14: ...xii Eserver pSeries 690 Installation Guide...
Страница 50: ...34 Eserver pSeries 690 Installation Guide...
Страница 54: ...38 Eserver pSeries 690 Installation Guide...
Страница 58: ...42 Eserver pSeries 690 Installation Guide...
Страница 74: ...58 Eserver pSeries 690 Installation Guide...
Страница 90: ...74 Eserver pSeries 690 Installation Guide...
Страница 108: ...92 Eserver pSeries 690 Installation Guide...
Страница 112: ...96 Eserver pSeries 690 Installation Guide...
Страница 117: ...1 2 3 1 Jam Nut 3 Rack Base 2 Leveling Foot Appendix J Removing and Installing the Rack Top Frame 101...
Страница 134: ...118 Eserver pSeries 690 Installation Guide...
Страница 138: ...122 Eserver pSeries 690 Installation Guide...
Страница 141: ......
Страница 142: ...IBMR Printed in U S A October 2002 SA38 0587 02...