I/O Subsystems (5 and 6) RIO Cabling to the Secondary I/O Book
Shown Without IBFs
C1
Primary Rack
5
Fifth I/O Subsystem
C2
Secondary Rack
6
Sixth I/O Subsystem
C3
Secondary I/O Book
Note: RIO cabling to I/O Subsystems 5 and 6 is the same for configurations with or without the
IBFs.
80
Eserver
pSeries 690 Installation Guide
Содержание eserver pSeries 690
Страница 1: ...pSeries 690 Installation Guide SA38 0587 02 ERserver IBM...
Страница 2: ......
Страница 3: ...pSeries 690 Installation Guide SA38 0587 02 ERserver IBM...
Страница 12: ...x Eserver pSeries 690 Installation Guide...
Страница 14: ...xii Eserver pSeries 690 Installation Guide...
Страница 50: ...34 Eserver pSeries 690 Installation Guide...
Страница 54: ...38 Eserver pSeries 690 Installation Guide...
Страница 58: ...42 Eserver pSeries 690 Installation Guide...
Страница 74: ...58 Eserver pSeries 690 Installation Guide...
Страница 90: ...74 Eserver pSeries 690 Installation Guide...
Страница 108: ...92 Eserver pSeries 690 Installation Guide...
Страница 112: ...96 Eserver pSeries 690 Installation Guide...
Страница 117: ...1 2 3 1 Jam Nut 3 Rack Base 2 Leveling Foot Appendix J Removing and Installing the Rack Top Frame 101...
Страница 134: ...118 Eserver pSeries 690 Installation Guide...
Страница 138: ...122 Eserver pSeries 690 Installation Guide...
Страница 141: ......
Страница 142: ...IBMR Printed in U S A October 2002 SA38 0587 02...