Chapter 6: Twinax Client Cabling Requirements and Problem Solving
138 Planning, Installation, and Maintenance Guide
Figure 75: Normal and Reversed Phase Designations
Note: No industry standard is assigned for designating the phase of baluns.
Other manufacturers might designate their “standard” balun to be either the
IBM “normal” or “reversed.” Using baluns from other manufacturers with
IBM baluns or hubs is not recommended. If you use baluns from other
manufacturers, make sure the baluns have the same pinout and phase as the
IBM baluns and hubs.
Baluns can include internal termination. This internal termination replaces
external terminators, self-terminating Y-cables, and so on, eliminating the
need for extra components.
Resolving UTP Cabling Problems
The examples in this section assume that all devices attached using baluns are
correctly terminated. Depending on the brand and type of the device, it can be
terminated by:
• Internal device switches
• Self-terminating Y or T cables
• Self-terminating baluns
Eliminate as many components as possible from your configuration so that
you can verify the simplest configuration.
Then, reconnect the components one at a time.
The checklist begins with the simplest configuration possible. Beginning at
the point where the systems fails, follow the steps in the checklist. If a step
fails, resolve the problem before going to the next step.
Step 1. Using a short length of twinax cable, attach the terminal directly to
the 5500 host port. If the device successfully connects, the 5500 system, the
Designation
Normal
Reverse
Phase A
Phase B
Phase A
Phase B
RJ112
Pins 2 and 5
Pins 3 and 4
5
4
2
3
2
3
5
4
RJ45
Pins 1 and 2
Pins 3 and 6
Pins 4 and 5
2
6
5
1
3
4
1
3
4
2
6
5
Содержание 5500-01E
Страница 1: ...S05J 4934 00 5500 Express IP Control Unit Planning Installation and Maintenance Guide...
Страница 2: ......
Страница 3: ...S05J 4934 00 5500 Express IP Control Unit Planning Installation and Maintenance Guide...
Страница 16: ...xvi Planning Installation and Maintenance Guide...
Страница 30: ...Chapter 1 Introducing the IBM 5500 Express IP Control Unit 30 Planning Installation and Maintenance Guide...
Страница 48: ...Chapter 2 Planning Your Installation 48 Planning Installation and Maintenance Guide...
Страница 54: ...Chapter 3 Installing the 5500 Express IP Control Unit 54 Planning Installation and Maintenance Guide...
Страница 68: ...Chapter 4 Configuring the 5500 Express IP Control Unit 68 Planning Installation and Maintenance Guide...
Страница 144: ...144 Planning Installation and Maintenance Guide...
Страница 145: ...Appendix A 145...
Страница 146: ...146 Planning Installation and Maintenance Guide...
Страница 147: ...Appendix A 147...
Страница 148: ...148 Planning Installation and Maintenance Guide...
Страница 149: ...Appendix A 149...
Страница 150: ...150 Planning Installation and Maintenance Guide...
Страница 151: ...Appendix A 151...
Страница 152: ...152 Planning Installation and Maintenance Guide...
Страница 153: ...Appendix A 153...
Страница 154: ...154 Planning Installation and Maintenance Guide...
Страница 155: ...Appendix A 155...
Страница 156: ...156 Planning Installation and Maintenance Guide...
Страница 157: ...Appendix A 157...
Страница 158: ...158 Planning Installation and Maintenance Guide...
Страница 164: ...164 Planning Installation and Maintenance...
Страница 184: ...Glossary 184...
Страница 188: ...Index 4...
Страница 191: ......