109
• Meter at last device to verify termination. If OK, find the open in the
cable. If you read 110 ohms from conductor to conductor and infinity
from conductors to shield, the shield is open. Otherwise, one or both
conductors could be open or the entire cable may be open (the cable might
have been cut into or is disconnected from a device splice joint). Go to
Step 11.
Step 10. Outdoor cable with station protectors installed.
Be aware that you can not meter through the station protectors. IBM
recommends that you replace the station protectors with splice joints. Return
to Step 2 and after correct completion, try operating the line without the
station protectors.
Caution: Do not bypass or leave the station protectors out of the line if an
electrical storm is pending.
If the line works OK without the station protectors, check for the following.
• A defective station protector.
• One or both protectors installed backwards. The outdoor cable must go to
the end of the station protector that has the ground wire.
• Excessive AC current flow on the shield of the cable caused by a
difference in ground potential between the buildings. No grounds or
missing grounds on the station protectors.
Step 11. Problem not resolved.
Return to Step 2 and re-check the path.
If the problem persists, use a scope to perform the “Advanced Time Domain
Relfectometry (TDR) Procedure” on page 113.
Note: While scoping the cable, have an assistant shake the cables at each
device. Look for momentary shorts and or opens to appear.
Steps to Check Cable Using a Current Probe
This section is for qualified maintenance personnel who service the 5500
Control Unit and twinax cabling installations. Refer to the Safety Information
Booklet, S021-0030.
You can perform the following cable check without interruption. This
procedure will find open shields on twinax cables and can work with any type
of oscilloscope (the oscilloscope setup, below, is for a Techtronics 475). The
system must be in a normal operating mode (for example, sign on screens on
the displays or customer actively using the system).
Step 1. Locate the following required parts:
• Oscilloscope
• Current probe with the following characteristics:
Содержание 5500-01E
Страница 1: ...S05J 4934 00 5500 Express IP Control Unit Planning Installation and Maintenance Guide...
Страница 2: ......
Страница 3: ...S05J 4934 00 5500 Express IP Control Unit Planning Installation and Maintenance Guide...
Страница 16: ...xvi Planning Installation and Maintenance Guide...
Страница 30: ...Chapter 1 Introducing the IBM 5500 Express IP Control Unit 30 Planning Installation and Maintenance Guide...
Страница 48: ...Chapter 2 Planning Your Installation 48 Planning Installation and Maintenance Guide...
Страница 54: ...Chapter 3 Installing the 5500 Express IP Control Unit 54 Planning Installation and Maintenance Guide...
Страница 68: ...Chapter 4 Configuring the 5500 Express IP Control Unit 68 Planning Installation and Maintenance Guide...
Страница 144: ...144 Planning Installation and Maintenance Guide...
Страница 145: ...Appendix A 145...
Страница 146: ...146 Planning Installation and Maintenance Guide...
Страница 147: ...Appendix A 147...
Страница 148: ...148 Planning Installation and Maintenance Guide...
Страница 149: ...Appendix A 149...
Страница 150: ...150 Planning Installation and Maintenance Guide...
Страница 151: ...Appendix A 151...
Страница 152: ...152 Planning Installation and Maintenance Guide...
Страница 153: ...Appendix A 153...
Страница 154: ...154 Planning Installation and Maintenance Guide...
Страница 155: ...Appendix A 155...
Страница 156: ...156 Planning Installation and Maintenance Guide...
Страница 157: ...Appendix A 157...
Страница 158: ...158 Planning Installation and Maintenance Guide...
Страница 164: ...164 Planning Installation and Maintenance...
Страница 184: ...Glossary 184...
Страница 188: ...Index 4...
Страница 191: ......