Chapter 6: Twinax Client Cabling Requirements and Problem Solving
132 Planning, Installation, and Maintenance Guide
Test for Cable Drop to Last Workstation on the Data Path
Use the following procedure to test the cable drop to the last workstation of
the data path:
1. Install the test connector on the cable drop to the last workstation.
2. Check for the resistances shown in Figure 69.
3. If only the last workstation is failing, do the following steps:
a. Disconnect the last workstation from the cabling system at the
Figure 68: Distribution Panel to Work Stations Except Last Workstation
Connect Meter Leads As Shown Below
Positive at Red Cable
Negative at Blue Cable
Normal Resistance
Red
Red
0 to 14
W
a
a. If surge suppressors are installed on the line, the normal resistance is 36
to 54
W
.
Green
Green
0 to 14
W
Red
Green
> 5000
W
Green
Red
> 5000
W
Shield
Red
> 5000
W
Shield
Green
> 5000
W
Figure 69: Last Workstation
Connector Meter Leads As Shown Below
Positive
Negative
Normal Resistance
Red
Green
140 to 180
W
a
a. If surge suppressors are installed on the line, the normal resistance is 175
to 225
W
for red to green and 90 to 110
W
for red or green to shells.
Shield
Red
65 to 95
W
Shield
Green
65 to 95
W
Содержание 5500-01E
Страница 1: ...S05J 4934 00 5500 Express IP Control Unit Planning Installation and Maintenance Guide...
Страница 2: ......
Страница 3: ...S05J 4934 00 5500 Express IP Control Unit Planning Installation and Maintenance Guide...
Страница 16: ...xvi Planning Installation and Maintenance Guide...
Страница 30: ...Chapter 1 Introducing the IBM 5500 Express IP Control Unit 30 Planning Installation and Maintenance Guide...
Страница 48: ...Chapter 2 Planning Your Installation 48 Planning Installation and Maintenance Guide...
Страница 54: ...Chapter 3 Installing the 5500 Express IP Control Unit 54 Planning Installation and Maintenance Guide...
Страница 68: ...Chapter 4 Configuring the 5500 Express IP Control Unit 68 Planning Installation and Maintenance Guide...
Страница 144: ...144 Planning Installation and Maintenance Guide...
Страница 145: ...Appendix A 145...
Страница 146: ...146 Planning Installation and Maintenance Guide...
Страница 147: ...Appendix A 147...
Страница 148: ...148 Planning Installation and Maintenance Guide...
Страница 149: ...Appendix A 149...
Страница 150: ...150 Planning Installation and Maintenance Guide...
Страница 151: ...Appendix A 151...
Страница 152: ...152 Planning Installation and Maintenance Guide...
Страница 153: ...Appendix A 153...
Страница 154: ...154 Planning Installation and Maintenance Guide...
Страница 155: ...Appendix A 155...
Страница 156: ...156 Planning Installation and Maintenance Guide...
Страница 157: ...Appendix A 157...
Страница 158: ...158 Planning Installation and Maintenance Guide...
Страница 164: ...164 Planning Installation and Maintenance...
Страница 184: ...Glossary 184...
Страница 188: ...Index 4...
Страница 191: ......