Chapter 6: Twinax Client Cabling Requirements and Problem Solving
122 Planning, Installation, and Maintenance Guide
The bumps at 1.3 and 2.5 indicate workstation connectors. The large bump at
2.5 indicates a larger mismatch (poor connection) than at 1.3.
Figure 54: Open Cable
Figure 55 is not a correct display of cable reflections. The multiple reflections
are at 26 m (85 ft) of a good cable with an open end. This display is caused by
the wrong vertical gain setting (0.5 V/div) and the wrong B-time/div. Only the
first reflection in this figure is important and should be magnified by changing
the vertical gain to 0.2 V/div and B-time to 0.05 µs/div.
Figure 55: Open Cable (Wrong Oscilloscope Setting)
Figure 56 shows a 155-m (510 ft) cable with one wire shorted to shield at
approximately 78 m (255 ft). The end is left open. This scope figure is valid
for the twinax cable only.
0.2 V
A=20 µs
B=0.2 µs
2.5
1.3
Open
55E1I031
Multiple Reflections
0.5 V
A=20 µs
B=0.1 µs
Open
0
55E1I032
Содержание 5500-01E
Страница 1: ...S05J 4934 00 5500 Express IP Control Unit Planning Installation and Maintenance Guide...
Страница 2: ......
Страница 3: ...S05J 4934 00 5500 Express IP Control Unit Planning Installation and Maintenance Guide...
Страница 16: ...xvi Planning Installation and Maintenance Guide...
Страница 30: ...Chapter 1 Introducing the IBM 5500 Express IP Control Unit 30 Planning Installation and Maintenance Guide...
Страница 48: ...Chapter 2 Planning Your Installation 48 Planning Installation and Maintenance Guide...
Страница 54: ...Chapter 3 Installing the 5500 Express IP Control Unit 54 Planning Installation and Maintenance Guide...
Страница 68: ...Chapter 4 Configuring the 5500 Express IP Control Unit 68 Planning Installation and Maintenance Guide...
Страница 144: ...144 Planning Installation and Maintenance Guide...
Страница 145: ...Appendix A 145...
Страница 146: ...146 Planning Installation and Maintenance Guide...
Страница 147: ...Appendix A 147...
Страница 148: ...148 Planning Installation and Maintenance Guide...
Страница 149: ...Appendix A 149...
Страница 150: ...150 Planning Installation and Maintenance Guide...
Страница 151: ...Appendix A 151...
Страница 152: ...152 Planning Installation and Maintenance Guide...
Страница 153: ...Appendix A 153...
Страница 154: ...154 Planning Installation and Maintenance Guide...
Страница 155: ...Appendix A 155...
Страница 156: ...156 Planning Installation and Maintenance Guide...
Страница 157: ...Appendix A 157...
Страница 158: ...158 Planning Installation and Maintenance Guide...
Страница 164: ...164 Planning Installation and Maintenance...
Страница 184: ...Glossary 184...
Страница 188: ...Index 4...
Страница 191: ......