29
Electrical
The 5500 Express IP Control Unit contains a 200W power supply with switch
settings from 90 to 132 VRMS and 180 to 264 VRMS. The power supply
operates from 48 through 63 Hertz.
Powering On
To prevent an unnecessary power loss, the 5500 Express IP Control Unit does
not provide a power switch. To power on the unit, connect the power cord
(refer to Figure 20 on page 52) and plug the cord into a receptacle.
Electrical Wiring Requirements
IBM recommends that you connect the 5500 Control Unit to a branch circuit
of 15 amperes. For safe and proper operation, this circuit must be grounded to
a dedicated equipment ground, not to a neutral ground. Do not use conduit as
the only grounding means.
IBM is not responsible for power outlet wiring.
Installing and Configuring Process
Following is an abbreviated flow of the installation and configuration
processes. This manual provides extensive step-by-step instructions on
completing each of these tasks.
1. Verify that the minimum hardware and software requirements are
available.
2. Set up the 5500 Control Unit by physically connecting a client
workstation with IP address 10.1.1.2 to the port 0, address 0 of the
5500 Control Unit’s 8-port breakout box.
3. Set up the initial configuration from this client workstation by
accessing the 5500 Control Unit’s ConfigurationPlus program. Use
a Web browser at URL
10.1.1.1
Electrical power
44.1 W
Capacity of exhaust
1.13 cubic meter/minute (40 cubic feet/min)
Noise level
40 dba
Leakage and starting
current
.7mA / 40 A
Содержание 5500-01E
Страница 1: ...S05J 4934 00 5500 Express IP Control Unit Planning Installation and Maintenance Guide...
Страница 2: ......
Страница 3: ...S05J 4934 00 5500 Express IP Control Unit Planning Installation and Maintenance Guide...
Страница 16: ...xvi Planning Installation and Maintenance Guide...
Страница 30: ...Chapter 1 Introducing the IBM 5500 Express IP Control Unit 30 Planning Installation and Maintenance Guide...
Страница 48: ...Chapter 2 Planning Your Installation 48 Planning Installation and Maintenance Guide...
Страница 54: ...Chapter 3 Installing the 5500 Express IP Control Unit 54 Planning Installation and Maintenance Guide...
Страница 68: ...Chapter 4 Configuring the 5500 Express IP Control Unit 68 Planning Installation and Maintenance Guide...
Страница 144: ...144 Planning Installation and Maintenance Guide...
Страница 145: ...Appendix A 145...
Страница 146: ...146 Planning Installation and Maintenance Guide...
Страница 147: ...Appendix A 147...
Страница 148: ...148 Planning Installation and Maintenance Guide...
Страница 149: ...Appendix A 149...
Страница 150: ...150 Planning Installation and Maintenance Guide...
Страница 151: ...Appendix A 151...
Страница 152: ...152 Planning Installation and Maintenance Guide...
Страница 153: ...Appendix A 153...
Страница 154: ...154 Planning Installation and Maintenance Guide...
Страница 155: ...Appendix A 155...
Страница 156: ...156 Planning Installation and Maintenance Guide...
Страница 157: ...Appendix A 157...
Страница 158: ...158 Planning Installation and Maintenance Guide...
Страница 164: ...164 Planning Installation and Maintenance...
Страница 184: ...Glossary 184...
Страница 188: ...Index 4...
Страница 191: ......