3-58
GROUP 4 ADJUSTMENT
CHECKING THE RING GEAR
BACKFACE RUNOUT
Runout specification : 0.20mm(0.008-inch)
maximum
Attach a dial indicator on the mounting
flange of the carrier.
Adjust the dial indicator so that the plunger
or pointer is against the back surface of the
ring gear.
Set the dial indicator to zero(0).
Rotate the ring gear and read the dial
indicator. The runout must not exceed
0.20mm(0.008inch).
If runout exceeds specification, remove the
differential and ring gear assembly from the
carrier. Refer to "Disassembling the
differential carrier assembly".
Check the differential parts, including the
carrier, for problems that may cause the ring
gear runout to exceed specifications.
Repair or replace parts.
Re-install the differential and ring gear into
the carrier. Refer to "Assembling the
differential case".
Repeat the preload adjustment of the
differential bearings.
1)
2)
3)
4)
5)
6)
7)
1.
D507AX53
INDICATOR
Rotate ring gear .
Содержание 60L-7A
Страница 11: ...SECTION 1 GENERAL Group 1 Safety hints 1 1 Group 2 Specifications 1 5 Group 3 Periodic replacement 1 13 ...
Страница 25: ...SECTION 2 REMOVAL INSTALLATION OF UNIT Group 1 Structure 2 1 Group 2 Removal and installation of unit 2 2 ...
Страница 32: ...2 7 Mast Refer to section on mast Page 2 2 1 2 POWER TRAIN ASSEMBLY REMOVAL 1 D503RE04 ...
Страница 69: ...3 28 50DFTM13 Remove bearing 67 and gear 68 30 68 67 ...
Страница 71: ...3 30 Remove oil seal 72 from the transmission case 34 50DFTM17 72 ...
Страница 98: ...3 57 Assemble wheel hub and tighten plug 14 Tightening torque 35 60kgf m 253 2 434 0lbf ft 12 50D7EDA61 ...
Страница 147: ...5 31 2 PRIORITY VALVE STRUCTURE 50DS7ESE08 1 Body 2 Spool 3 Spring plug 4 End plug 5 Spring 6 O ring 7 Orifice 1 ...
Страница 188: ...7 3 10MM RING ELECTRIC CIRCUIT FOR LPG FUE KIT 35L7AEL07 ...
Страница 189: ...7 4 MEMORANDUM ...