3-5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
19
20
21
18
17
16
50DF7TA03
The basic components of the power train are : engine, torque converter, power shift transmission,
drive axle and drive wheels. Power from the engine flywheel goes from the torque converter to the
input shaft of the transmission. The power shift transmission is a constant mesh countershaft type
and has four hydraulically operated clutches that are spring released. The transmission has two
speeds in forward and two speeds in reverse. In other words, The transmission is a constant mesh
power shift transmission and gives two forward and two reverse speeds. The transmission has four
cluthces that are engaged hydraulically and released by spring force. The direction and speed are
changed electrically.
Damage can be caused to the transmission if the truck is moved with the engine not
running.
There will be no lubrication to the transmission components.
3. TRANSMISSION
1
Torque converter
2
Input shaft
3
3 P.T.O gears
4
Pump assembly
5
Gear (FR, 2 stage)
6
Clutch (FR, 2 stage)
7
Clutch drum(FR)
8
Clutch piston
9
Valve assembly
10
Clutch (FR, 1 stage)
11
Gear (FR, 1 stage)
12
Gear (RR, 1 stage)
13
Clutch (RR, 1 stage)
14
Counter shaft
15
Clutch drum (RR)
16
Clutch (RR, 2 stage)
17
Gear (RR, 2 stage)
18
Gear (Output, 2 stage)
19
Gear (Output, 1 stage)
20
Intermediate shaft
21
Output shaft
STRUCTURE
1)
OPERATION
2)
Содержание 60L-7A
Страница 11: ...SECTION 1 GENERAL Group 1 Safety hints 1 1 Group 2 Specifications 1 5 Group 3 Periodic replacement 1 13 ...
Страница 25: ...SECTION 2 REMOVAL INSTALLATION OF UNIT Group 1 Structure 2 1 Group 2 Removal and installation of unit 2 2 ...
Страница 32: ...2 7 Mast Refer to section on mast Page 2 2 1 2 POWER TRAIN ASSEMBLY REMOVAL 1 D503RE04 ...
Страница 69: ...3 28 50DFTM13 Remove bearing 67 and gear 68 30 68 67 ...
Страница 71: ...3 30 Remove oil seal 72 from the transmission case 34 50DFTM17 72 ...
Страница 98: ...3 57 Assemble wheel hub and tighten plug 14 Tightening torque 35 60kgf m 253 2 434 0lbf ft 12 50D7EDA61 ...
Страница 147: ...5 31 2 PRIORITY VALVE STRUCTURE 50DS7ESE08 1 Body 2 Spool 3 Spring plug 4 End plug 5 Spring 6 O ring 7 Orifice 1 ...
Страница 188: ...7 3 10MM RING ELECTRIC CIRCUIT FOR LPG FUE KIT 35L7AEL07 ...
Страница 189: ...7 4 MEMORANDUM ...