8-7
GROUP 3 ADJUSTMENT
1. MAST LOAD ROLLER(V, VF MAST)
INNER/OUTER MAST ROLLER
CLEAR-ANCE ADJUSTMENT
Measure the clearance with the mast
overlap at near 480mm.
Shift the inner mast to one side to bring
the roller into contact with the outer mast,
and adjust the clearance between the
roller side face and mast at the closest
position on the opposite side to the
following value by inserting the inner/outer
mast roller shim.
·
Standard clearance A, B = 0~0.6mm
·
Shim thickness 0.5, 1.0mm
Distribute the shim thickness equally to
the left and right roller. Refer to Mast load
roller and back up liner, removal and
Installation.
After the adjustment, check that the inner
mast moves smoothly in the outer mast.
1)
(1)
(2)
(3)
(4)
L15C3MS04
L15C3MS05
Содержание 60L-7A
Страница 11: ...SECTION 1 GENERAL Group 1 Safety hints 1 1 Group 2 Specifications 1 5 Group 3 Periodic replacement 1 13 ...
Страница 25: ...SECTION 2 REMOVAL INSTALLATION OF UNIT Group 1 Structure 2 1 Group 2 Removal and installation of unit 2 2 ...
Страница 32: ...2 7 Mast Refer to section on mast Page 2 2 1 2 POWER TRAIN ASSEMBLY REMOVAL 1 D503RE04 ...
Страница 69: ...3 28 50DFTM13 Remove bearing 67 and gear 68 30 68 67 ...
Страница 71: ...3 30 Remove oil seal 72 from the transmission case 34 50DFTM17 72 ...
Страница 98: ...3 57 Assemble wheel hub and tighten plug 14 Tightening torque 35 60kgf m 253 2 434 0lbf ft 12 50D7EDA61 ...
Страница 147: ...5 31 2 PRIORITY VALVE STRUCTURE 50DS7ESE08 1 Body 2 Spool 3 Spring plug 4 End plug 5 Spring 6 O ring 7 Orifice 1 ...
Страница 188: ...7 3 10MM RING ELECTRIC CIRCUIT FOR LPG FUE KIT 35L7AEL07 ...
Страница 189: ...7 4 MEMORANDUM ...