3-2
Item
Unit
Specification
Torque converter
Transmission
T/M valve
Charging pump
Drive axle
Differential
Type
Power transmit
Type/Gear shift
Gear ratio
P.T.O system
T/M oil
Oil quantity
Type
Displacement
Gear ratio
Axle oil
Oil quantity
Service brake
Brake oil
Parking brake
Gear type
Differential type
-
-
-
-
-
-
-
ℓ
-
cc/rev
-
-
-
-
ℓ
-
-
-
-
-
3 elements 2 phase 1 stage
Torque converter
POWER SHIFT / F2 : R2
4.97
1.55
Included
DEXRON 3
13
Electric
20.6
2.636
4
10.545
MOBILFLUID 424
12.5
Wet disk brake
AZOLA-ZS10
Ratchet drum brake
Spiral bevel gear
4 pinions
FR/RR 1 stage
FR/RR 2 stage
Differential
Planetary
Total
Brake
SPECIFICATION
3)
Содержание 60L-7A
Страница 11: ...SECTION 1 GENERAL Group 1 Safety hints 1 1 Group 2 Specifications 1 5 Group 3 Periodic replacement 1 13 ...
Страница 25: ...SECTION 2 REMOVAL INSTALLATION OF UNIT Group 1 Structure 2 1 Group 2 Removal and installation of unit 2 2 ...
Страница 32: ...2 7 Mast Refer to section on mast Page 2 2 1 2 POWER TRAIN ASSEMBLY REMOVAL 1 D503RE04 ...
Страница 69: ...3 28 50DFTM13 Remove bearing 67 and gear 68 30 68 67 ...
Страница 71: ...3 30 Remove oil seal 72 from the transmission case 34 50DFTM17 72 ...
Страница 98: ...3 57 Assemble wheel hub and tighten plug 14 Tightening torque 35 60kgf m 253 2 434 0lbf ft 12 50D7EDA61 ...
Страница 147: ...5 31 2 PRIORITY VALVE STRUCTURE 50DS7ESE08 1 Body 2 Spool 3 Spring plug 4 End plug 5 Spring 6 O ring 7 Orifice 1 ...
Страница 188: ...7 3 10MM RING ELECTRIC CIRCUIT FOR LPG FUE KIT 35L7AEL07 ...
Страница 189: ...7 4 MEMORANDUM ...