7-5
1. POWER CIRCUIT
The negative terminal of the battery is grounded to the machine chassis.
When the start switch is in the off position, the current flows from the positive battery terminal.
OPERATING FLOW
B) Start motor [CN-45(B+)] I/conn [CN-1(2)]
Start switch [CS-2(3)]
Fuse box [CN-36] (No.1) Horn [CN-25(1)]
Brake switch [CD-4]
(No.2) OPSS buzzer [CN-113(2)]
OPSS unit [CN-55(12)]
(No.3) Flasher unit [CR-11(2)]
(No.4) Cabin [CN-17(1)]
1)
CHECK POINT
2)
Engine
OFF
Key switch
OFF
Voltage
12V
Check point
①
- GND (B))
②
- GND (Fuse No.1)
③
- GND(Start key)
※
GND : Ground
Содержание 60L-7A
Страница 11: ...SECTION 1 GENERAL Group 1 Safety hints 1 1 Group 2 Specifications 1 5 Group 3 Periodic replacement 1 13 ...
Страница 25: ...SECTION 2 REMOVAL INSTALLATION OF UNIT Group 1 Structure 2 1 Group 2 Removal and installation of unit 2 2 ...
Страница 32: ...2 7 Mast Refer to section on mast Page 2 2 1 2 POWER TRAIN ASSEMBLY REMOVAL 1 D503RE04 ...
Страница 69: ...3 28 50DFTM13 Remove bearing 67 and gear 68 30 68 67 ...
Страница 71: ...3 30 Remove oil seal 72 from the transmission case 34 50DFTM17 72 ...
Страница 98: ...3 57 Assemble wheel hub and tighten plug 14 Tightening torque 35 60kgf m 253 2 434 0lbf ft 12 50D7EDA61 ...
Страница 147: ...5 31 2 PRIORITY VALVE STRUCTURE 50DS7ESE08 1 Body 2 Spool 3 Spring plug 4 End plug 5 Spring 6 O ring 7 Orifice 1 ...
Страница 188: ...7 3 10MM RING ELECTRIC CIRCUIT FOR LPG FUE KIT 35L7AEL07 ...
Страница 189: ...7 4 MEMORANDUM ...