![Hurco AB6 Скачать руководство пользователя страница 98](http://html1.mh-extra.com/html/hurco/ab6/ab6_installation-manual_2187300098.webp)
Installation
Autobend 6
November, 1999
2-59
J8 Connector
Make connections to the J8 connector as follows:
1.
Remove the J8 connector from the Main board.
2.
Open a terminal by inserting the blade of a small flat
screwdriver into the rectangular slot above the wire
connection point as shown in the figure below.
3.
As the directions in the following text require, insert the
stripped wire into the circular hole directly below the
appropriate rectangular slot. Be sure that the jaws do not
pinch the wire insulation.
4.
Remove the screwdriver. Gently pull on the wires to ensure
they are securely set in the connector.
5.
Repeat these steps for each wire connection.
Figure 2-46. Inserting Wires into a J8 Connector
Advance Connections
There are different types of connections to advance the gauge. These
connections are made with a shielded cable that runs between the advance
and the AB6 power cabinet.
The advance switch signals the gauge to advance to its next programmed
station on mechanical and upacting press brakes. However, for Guifil and
Adira upacting press brakes the advance cable is connected without using
the advance switch. An external advance relay provides a direct
connection to its upper limit switch for hydraulic press brakes.
For more specific connection information, read the press brake’s
instructions.
Содержание AB6
Страница 3: ...iv Revision E Hurco...
Страница 5: ...vi Revision E Hurco...
Страница 13: ...Installation Manual xiv Revision E Hurco...
Страница 39: ...Installation Manual 1 24 Revision E Hurco...