![Hurco AB6 Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/hurco/ab6/ab6_installation-manual_2187300037.webp)
Installation Manual
1-22
Revision E
Hurco
Calibration
The axes automatically calibrate and position to the first bend (i.e., station)
during start-up when a job is programmed and the Run button is pressed.
There are additional calibration procedures to follow for the AB6 control.
Refer to the Programming and Operations manual for details.
Start-up Procedure
The following sections contain procedures for powering up the AB6
control.
Follow these instructions to power up the AB6 system:
1.
Turn on the power to the AB6 using the switch on the side of
the AB6 power cabinet. The AB6 control performs this
power-up sequence:
a.
All segments of the LEDs light up for
approximately 3 seconds.
b.
The software version number appears in the Gauge
display.
c.
The date appears in the Ram display.
d.
The number of available Jobs and Bends appears in
their displays.
2.
Turn on the power to the press brake and start the pump
motor by following the manufacturer’s instructions.
3.
Following the power-up sequence, data for the most recently
operated job appears in the Job and Bend displays. Program
the job if it is not already programmed. (Refer to the
“Programming and Operations” chapter of the AB6
Programming and Operations manual for more information.)
4.
Press the Job key.
5.
Select a job from memory by inputting a Job number, or
program a new job.
6.
The axes calibrate and then position to the first bend.
7.
The bending operation may begin.
Содержание AB6
Страница 3: ...iv Revision E Hurco...
Страница 5: ...vi Revision E Hurco...
Страница 13: ...Installation Manual xiv Revision E Hurco...
Страница 39: ...Installation Manual 1 24 Revision E Hurco...