UPS5000-E-(400 kVA-600 kVA)
User Manual (60 kVA Power Modules)
3 Installation
Issue 05 (2019-12-24)
Copyright © Huawei Technologies Co., Ltd.
57
Ensure that the installation ground is flat.
The marking-off template is delivered with the UPS.
Procedure
Step 1
Determine the cabinet installation positions on the ground based on holes in the marking-off
template for ground installation.
A: mounting holes on the channel steel
B: mounting holes on the floor
Figure 3-5
Mounting hole dimensions for the 400 kVA UPS and 500 kVA UPS (unit: mm)