UPS5000-E-(400 kVA-600 kVA)
User Manual (60 kVA Power Modules)
4 User Interface
Issue 05 (2019-12-24)
Copyright © Huawei Technologies Co., Ltd.
130
Test
, and
Capacity Test
. The next maintenance time displayed on the screen indicates the
upcoming time in which to check batteries.
Figure 4-37
Battery maintenance
Item
Description
Forced Equalized Charging
Forcibly perform equalized charging on batteries.
Shallow Dis. Test
Partially discharge batteries. A shallow discharge test can
be conducted to test the battery loop reliability and
short-time discharge capacity when the batteries have not
discharged for a long time.
Capacity Test
Fully discharge batteries. A deep discharge test is
conducted to obtain the battery discharge performance
data.
USB Operations
Figure 4-38
USB operations 1