UPS5000-E-(400 kVA-600 kVA)
User Manual (60 kVA Power Modules)
5 Operations
Issue 05 (2019-12-24)
Copyright © Huawei Technologies Co., Ltd.
179
Figure 5-17
Starting a capacity test
The capacity test automatically stops in any of the following cases:
The battery discharge voltage reaches the end of discharge (EOD) voltage plus 0.01 V.
The load fluctuation exceeds 10%.
An alarm is generated.
When the battery discharge voltage reaches the EOD voltage plus 0.01 V, the test is complete. The test
data is used as capacity test data. Save the capacity test data record with the largest discharge capacity in
a month as the capacity test data for the month. A maximum of recent 36 capacity test records can be
saved.
----End
5.6.4 Test Data Download
Procedure
Step 1
On the WebUI, choose
Query
>
Logs
.
Step 2
Choose logs that need to be exported from the
Log
drop-down list box, and click
Query
.
Figure 5-18
Logs
----End