Procedure
1. Power down the server blade.
2. Remove the server blade from the chassis.
3. Remove the 1U air baffle.
Installing the air baffle for 1U server blade
Procedure
1. Install the air baffle.
2. Install the server blade in the chassis.
Operations
21
Содержание ProLiant e910
Страница 148: ...148 Customer self repair...
Страница 149: ...Customer self repair 149...
Страница 150: ...150 Customer self repair...
Страница 158: ...c Remove the PCIe riser board Right PCIe riser board Left PCIe riser board 158 Removal and replacement procedures...
Страница 182: ...UID unit identification UEFI Unified Extensible Firmware Interface 182 Acronyms and abbreviations...