3. Install the server blade in the chassis.
Powering down the server blade
Before powering down the server blade for any upgrade or maintenance procedures, perform a backup of critical data and
programs.
Blades can be powered down individually and as a group of all blades in the chassis. Choose the procedure that fits your need.
To power down, do one of the following:
• Press the Power on button on the server blade momentarily.
This method initiates a controlled shutdown of applications and the OS before the blade enters standby mode.
• Press and hold the Power On/Standby button of the blades installed in the system for 5 seconds, and then release it to
force the server blade to power down.
This method forces the server blade to power down without properly exiting applications and the OS. If an application
stops responding, you can use this method to force a shutdown.
• Use the virtual power button in the Edgeline EL8000 Chassis Manager web interface.
• Use the virtual power button in the blade iLO web interface.
• Enter the
set power off b
<slot#>
at the chassis manager CLI. See the HPE Edgeline EL8000 Converged Edge
System Chassis Manager CLI User Guide on the
HPE website for details on CLI commands.
Before proceeding, verify that the server blade is in standby mode by observing that the system power LED is amber. See
Server blade LEDs.
Operations
23
Содержание ProLiant e910
Страница 148: ...148 Customer self repair...
Страница 149: ...Customer self repair 149...
Страница 150: ...150 Customer self repair...
Страница 158: ...c Remove the PCIe riser board Right PCIe riser board Left PCIe riser board 158 Removal and replacement procedures...
Страница 182: ...UID unit identification UEFI Unified Extensible Firmware Interface 182 Acronyms and abbreviations...