Procedure
1.
2.
Remove the server blade from the chassis.
3.
For 2U server blade, do the following:
4.
If installed, remove the metal plate from the front of the server blade.
5.
If installed,
remove the NVMe M.2 enablement board.
6.
Install the network riser.
• 1U server blade
Hardware options installation
35
Содержание ProLiant e910
Страница 148: ...148 Customer self repair...
Страница 149: ...Customer self repair 149...
Страница 150: ...150 Customer self repair...
Страница 158: ...c Remove the PCIe riser board Right PCIe riser board Left PCIe riser board 158 Removal and replacement procedures...
Страница 182: ...UID unit identification UEFI Unified Extensible Firmware Interface 182 Acronyms and abbreviations...