Procedure
1. Align the blade and install it in the chassis:
a. Insert the blade in the chassis.
b. Close the latch on the server blade and secure it.
2. Optional: Lock the server blade.
Removing the blade from the chassis
Prerequisites
Before performing this procedure, make sure that you have the T-15 Torx key available.
18 Operations
Содержание ProLiant e910
Страница 148: ...148 Customer self repair...
Страница 149: ...Customer self repair 149...
Страница 150: ...150 Customer self repair...
Страница 158: ...c Remove the PCIe riser board Right PCIe riser board Left PCIe riser board 158 Removal and replacement procedures...
Страница 182: ...UID unit identification UEFI Unified Extensible Firmware Interface 182 Acronyms and abbreviations...