15
b) "G" Control Board
KM-320MAH-E and KM-650MAH-E Auxiliary Code U-1 and Later
KM-515MAH-E Auxiliary Code U-2 and Later
The steps in the sequence are as outlined below. When power is supplied, the red
"POWER OK" LED and the green "BC CLOSED" LED on CB turn on (If yellow
"BC OPEN" LED is on, the icemaker will not start. In this case clear ice away from BC
actuator paddle in the storage bin area). A 5-second delay occurs at startup. Note that
the order of the green sequence LEDs from the outer edge of the board is 1, 4, 3, 2.
(1) 1-Minute Fill Cycle
LED 4 is on.
WV energizes and the fill period begins. After 1 minute, CB checks for
a closed F/S. If F/S is closed, the harvest cycle begins. If not, WV remains energized
through additional 1-minute fill cycles until water enters the water tank and F/S closes.
This serves as a low water safety to protect PM
.
(2) Initial Harvest Cycle
LEDs 1, 4, and 2 are on.
WV remains energized, Comp and HGV energize. CB
monitors the warming of the evaporator via the thermistor located on the suction line.
When the thermistor reaches 48°F (9°C), CB reads 3.9 kΩ from the thermistor and
turns harvest termination over to the adjustable harvest timer (S4 dip switch 1 & 2).
The harvest timer has settings of 60, 90, 120, and 180 seconds. The pump-out timer
(S4 dip switch 3 & 4) acts in place of the harvest timer during cycles with a pump-out
(S4 dip switch 5 & 6). WV is energized during harvest for a maximum of 6 minutes
or the length of harvest, whichever is shorter.
NOTICE!
Do not adjust S4 dip switch
7 out of the factory default position. This dip switch must be left in the factory
default position or this icemaker will not operate correctly.
For details, see
"II.C.3.e) Bin Control Selector/Harvest Pump Timer (S4 dip switch 7)." LED 4 turns
off when WV de-energizes. The minimum total time allowed by CB for a complete
harvest cycle is 2 minutes. At the end of harvest, CB checks position of F/S and
proceeds to the freeze cycle if it is closed or calls for a 1-minute fill if it is open.
(3) Freeze Cycle
LED 1 is on.
Comp remains energized, PM, FM, and LLV (KM-515MAH-E) energize.
HGV and WV de-energize. For the first 5 minutes, CB will not terminate the freeze
cycle. At the end of 5 minutes, F/S assumes control of the freeze cycle. As ice builds
on the evaporator, the water level in the water tank lowers. Freeze continues until
F/S opens, provided the 5-minute minimum freeze timer has terminated. There is a
15 second delay before CB acknowledges an open F/S.