![Hoshizaki DCM-230FE Скачать руководство пользователя страница 47](http://html1.mh-extra.com/html/hoshizaki/dcm-230fe/dcm-230fe_service-manual_2164975047.webp)
47
10) Install the new Gear Motor. Insert the liner under the Gear Motor, and secure it with the three
hexagon bolts.
11) Assemble the removed parts in the reverse order of which they were removed.
12) Open the water supply tap.
13) Plug in the ice dispenser.
14) Check for water leaks.
[b] EXTRUDING HEAD
WARNING
The Extruding Head has an interference-fitted resin bearing that may be worn
for years. Inspect it at least once a year or every 10,000 hours of operation,
depending on the water quality. Replace the bearing whenever the clearance
between the bearing and the Auger Shaft exceeds 0.5 mm.
1) Unplug the ice dispenser.
2) Close the water supply tap.
3) Remove the Panels.
4) Remove the four Thumbscrews securing the Spout, and remove the Spout and the
Packing inside the Storage Bin.
5) Remove the three Thumbscrews securing the Chute Head to the top of the Evaporator,
and lift off the Chute Head.
6) Remove the Cylinder Packing.
7) Remove the Cutter.
8) Remove the four Socket Head Cap Screws securing the Extruding Head, and lift off the
Extruding Head.
9) Install the new Extruding Head.
CAUTION
Always install new Socket Head Cap Screws every time the Extruding Head is
replaced.
Содержание DCM-230FE
Страница 5: ...5 I GENERAL INFORMATION 1 DIMENSIONS CONNECTIONS...
Страница 9: ...9...
Страница 26: ...26 9 Plug in the ice dispenser 10 Check for water leaks 11 Replace the panels in their correct positions Fig 13...
Страница 27: ...27 V TECHNICAL INFORMATION 1 WATER CIRCUIT AND REFRIGERANT CIRCUIT...
Страница 28: ...28 2 WIRING DIAGRAM...
Страница 29: ...29 3 TIMING CHART...
Страница 46: ...46 Fig 14...