![horsch SW 3500 S Скачать руководство пользователя страница 40](http://html1.mh-extra.com/html/horsch/sw-3500-s/sw-3500-s_operating-instructions-manual_2164120040.webp)
Roller replacement
Check that the rubber sealing strip is set cor-
rectly and that the roller runs true every time a
roller is replaced.
Roller replacement
After the roller has been selected from the table,
it must be installed in the metering unit.
When replacing the roller, the seed
hopper should be empty.
Unscrew the side cover.
Pull out the roller together with the drive
shaft.
Roller replacement
Remove the circlip and plain washer.
Pull out the drive shaft and insert it into the
new roller.
Axial play of the drive shaft in the roller is neces-
sary for self-cleaning the roller when installed in
the metering unit housing.
The base of the metering unit is shut off from
the Venturi pipe. In the Venturi pipe, the seed
is transported by the stream of air.
When calibrating, the seed is removed from
the metering unit via the opening in the Venturi
pipe.
The cover must then be firmly closed and sealed
once again.
Roller replacement with a full
hopper
Roller replacement with a full hopper
Unscrew wing screws on the side cover and
drive motor, then remove the side cover and
motor.
Remove circlip and plain washer from the
drive shaft.
Insert the drive shaft into the new metering
roller thus pushing out the old roller on the
motor side.
Remove the drive shaft from the old roller and
install it in the new one; fit the side cover and
motor and fasten in place.