![horsch SW 3500 S Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/horsch/sw-3500-s/sw-3500-s_operating-instructions-manual_2164120020.webp)
1
Assembly:
Basic equipment with screen
Assemble the screen holder in a suitable
place within the operator's area of visibility
and operation.
Route the thick cable to the battery and trim,
if necessary.
Tightly and permanently connect both fuse
holders to the cable.
Tightly connect both red cables to the plus
on the battery and both black cables to the
minus on the battery.
Attach the screen holder to the screen and
fix the connecting cable on the underside of
the screen.
Install DrillManager
The basic equipment has to be installed on the
tractor during initial installation in all machines
with seeder controls.
The cables for the basic equipment have to be
directly connected to the battery on the tractor.
The cables should not rub and the insulation
should not be damaged.
The connections have to make good connect
with the battery. Assembly errors result in volt-
age drops and undefinable error messages and
malfunctions.
The cables should never be connected
to other connectors in the operator's
cabin.
DrillManager Müller (ME)
The basic equipment is fitted with 2 x 6 mm² and
2 x 2.5 mm² cables respectively for the electrical
power supply.
Only the two 6 mm² cables have to be connected
in deliveries up to approx. May 2006 (only one
50 A fuse is available).
From approx. May 2006, all cables have to be
connected (an additional 10 A fuse is available
for the red 2.5 mm² cable).
The screen should not impair the op-
erator's visibility of the road