
....................................65
Default assignment multi-function handle
Transport, document and safety container
Document roll ...............................................67
.................................................68
Folding boom ................................................69
Folding variants – folding boom
BoomControl ..............................................72
............................................73
Collision protection ....................................75
Spraying line ..............................................76
Nozzle body ...............................................77
....................................80
Hydraulic connections ..................................80
Coupling hydraulic hoses ...........................80
Uncoupling hydraulic hoses .......................80
Hydraulic compressor (optional)
................................85
.........................................87
...................................87
Edge and border nozzles..............................88
SectionBox (optional) ................................89
.....................................90
Automatic Tyre Pressure Control (ATP)
.......................................................91
.................................92
Operation .....................................................93
Commissioning / Tractor change ..................93
......................................93
Connecting ...................................................94
Transport position .........................................95
.........................................................96
Manoeuvring the uncoupled machine ........96
..............................97
....................................................98
Folding .......................................................98
Preparation for spraying operation
Calculating filling / refill quantities
Filling table for residual areas
Filling the spraying mixture container
..............................104
Direct filling / External filling (optional)
Filling the fresh water tank through
..........................................105
............................106
Illuviation valve ........................................106
Flushing in liquid preparations during
the filling process on machines of the
CCS Pro variant .......................................107
Flushing in liquid preparations for full
or partly filled spraying mixture
CCS Pro variant .......................................108
Illuviation of powdery preparations
and carbonyl diamide on machines
.............................109
Pre-cleaning the canister with
spraying mixture ......................................109
Canister cleaning with fresh water
Spraying operation .....................................110
Special notes for spraying operation
Folding boom control ............................... 111
Spraying pressure, nozzle size,
placing quantity, travel speed, agitator .... 111
Spraying ...................................................112
Measures for windward drift reduction
Spraying with 25 cm nozzle spacing
and reduced target area distance ...........113
container via the pressure output ............113
Faults ..........................................................115
Nozzle selection .......................................116
3
Содержание LEEB 12 TD
Страница 2: ......
Страница 5: ......
Страница 9: ...5...
Страница 27: ...Safety stickers with the addition 2x can be found on either side of the machine 2x 23...
Страница 121: ...Diagram a with example 117...
Страница 146: ...Suspension cylinder Suspension cylinder 142...
Страница 148: ...Parallelogram lock Pendulum lock cylinder Parallelogram Parallelogram 144...
Страница 180: ......