
Inspection of brake lining
Open the inspection opening for checking the
brake lining thickness by folding the rubber tab
open.
The brake lining must be replaced when the
bottom edge of the wear pocket has been
reached. The residual lining thickness must be
at least 2 mm.
Reinsert the rubber tab again after the check.
Brake adjustment
The function and wear of the brakes must be
checked continuously and adjusted, if this
should be necessary.
Resetting the brake is necessary, if approx. 2/3
of the max. cylinder stroke is utilized for flat-out
braking.
Adjustment work must be carried out by techni-
cal personnel of a workshop!
Air vessel
NOTE
The air vessel must be drained daily!
Pull the drain valve (3) until water stops running
out from the air vessel through the valve.
In case of contamination unscrew the drain valve
(3) from the air vessel and clean the air vessel.
1
1
3
3
4
2
2
1 Air vessel
2 Tension straps
3 Drain valve
4 Test port for pressure gauge
150
151
Содержание LEEB 12 TD
Страница 2: ......
Страница 5: ......
Страница 9: ...5...
Страница 27: ...Safety stickers with the addition 2x can be found on either side of the machine 2x 23...
Страница 121: ...Diagram a with example 117...
Страница 146: ...Suspension cylinder Suspension cylinder 142...
Страница 148: ...Parallelogram lock Pendulum lock cylinder Parallelogram Parallelogram 144...
Страница 180: ......