
51
TO Transceiver Operating Parameters
Sets the
T
ransceiver
O
perating parameters for the ring, or multi-drop, transceiver interface protocol.
See Figure 9 for
TO=A
,
S
, and
H
command illustrations.
(Default:
TO=R0C
for ring type or
TO=M1C
for multi-drop type)
Inquiry:
*dd
TO
Action:
*dd
WE
EEPROM Store: *dd
WE
*dd
TO=
{
R
|
M
} or *dd
TO=
{
0-3
} or
*dd
SP=ALL
*dd
TO=
{
C
|
A
|
S
|
H
}
R
Ring protocol for HPB units.
M
Multidrop protocol for HPB units.
...................................................................................................
0-3
Controls the minimum command response delay, multi-drop bus turn around time. For baud
rate of 9600 and below, each count (0-3) represents about 1 millisecond. For baud rates above
9600, each count represents one character transmission time. This feature has no effect on ring
network units.
Baud
1200
2400
4800
9600
14400
19200
28800
time/count
1 ms
1 ms
1 ms
1 ms
0.7 ms 0.5 ms 0.3 ms
C
Allows a multi-drop unit to transmit
C
ontinuous pressure readings (
P2
or
P4
) when the device
ID is used. This parameter has no effect on ring network units.
A
Multi-drop only:
Causes the
SI
command to start a pressure integration cycle and
not
clear
the result of the previous cycle so it can be read with a
P2
or
P4
command if the result
has not been previously read. When the synchronized cycle completes a new cycle is
immediately started.
SMulti-drop only:
Causes the
SI
command to start a pressure integration cycle and clear the
result of the previous cycle so that a
P2
or
P4
command produces a pressure reading not
available indication (<cr> only) if a
P2
or
P4
read attempt is made before the new integration
cycle completes. When the synchronized cycle completes, a new cycle is immediately started.
If the pressure reading produced by the synchronized cycle is to be read it must be read before
the next integration cycle completes
H
Multi-drop only:
Causes the
SI
command to start a pressure integration cycle and clear the
result of the previous cycle so that a
P2
or
P4
command produces a pressure reading not
available indication (<cr> only) if a
P2
or
P4
read attempt is made before the new integration
cycle completes. When the synchronized cycle completes, the pressure reading is
H
eld until it
is read or until a new
SI
command is issued.
Setting:
When an
SI
Command is sent:
TO=C
, or
A
Restart
I=
cycle
TO=S
Restart
I=
cycle, Clear previous
I=
value
TO=H
Restart
I=
cycle, Clear previous
I=
value, Stop after 1
I=
cycle