
6.3 Measurement examples
92
Measuring the internally powered equipment 2
1.
Press
in the measurement screen and
select
under measured terminal.
2.
Connect test leads to terminals T2.
3.
Position the tip of the test lead connected to termi-
nal T2 on the applied part of the equipment under
test.
4.
During manual measurement, patient leakage cur-
rent (patient connection - earth) measurement
starts upon return to the measurement screen.
Measurement conditions can be changed during
measurement.
See
"6.1 Making manual measurements" (p. 79)
During automatic measurements,
becomes
available upon return to the measurement screen.
Press
to start patient leakage current
(patient connection - earth) measurement.
Only
is available during automatic measure-
ments.
1
1
2
3
Terminal T2 and applied part
When the instrument is set to internally powered equipment, even if the breaker
is turned On, the power supply to the equipment under test will be interrupted
(grounding connection will also be interrupted).
Содержание ST5540
Страница 2: ......
Страница 6: ...Contents iv Index i ...
Страница 29: ...23 2 Chapter 2 Instrument Labels and Screens Instrument Labels and Screens Chapter 2 ...
Страница 80: ...4 8 Changing the Measurement Method Auto Manual 74 ...
Страница 121: ...115 8 9 7 Chapter 7 Instrument System Settings Instrument System Settings Chapter 7 ...
Страница 144: ...7 14 Setting the Backlight 138 ...
Страница 284: ...10 14 Measurement Networks 278 ...
Страница 290: ...11 4 Instrument Disposal 284 ...
Страница 320: ...Appendix4 External Dimensions A30 ...
Страница 323: ......
Страница 324: ......
Страница 325: ......
Страница 326: ......