
6.3 Measurement examples
90
*
only when selecting a network B1 or B2 (B1 selected, patient leakage current I)
Measuring the class-I equipment and class-II equipment
1.
Connect the instrument and the equipment under test.
See
"3.3 Connecting equipment under test to the instrument" (p. 36)
2.
Connect a test lead to terminal T2.
3.
Position the tip of the test lead on the applied part of the equipment under test.
4.
During manual measurement, patient leakage current (patient connection - earth)/patient leak-
age current I measurement starts upon return to the measurement screen.
Measurement conditions can be changed during measurement.
See
"6.1 Making manual measurements" (p. 79)
During automatic measurements,
becomes available upon return to the measurement
screen. Press
to start patient leakage current (patient connection - earth)/patient leakage
current I measurement.
Only
is available during automatic measurements.
Patient leakage current measurement
*
(Patient connection - Earth)
1
2
3
Terminal T2 and applied part
4
Содержание ST5540
Страница 2: ......
Страница 6: ...Contents iv Index i ...
Страница 29: ...23 2 Chapter 2 Instrument Labels and Screens Instrument Labels and Screens Chapter 2 ...
Страница 80: ...4 8 Changing the Measurement Method Auto Manual 74 ...
Страница 121: ...115 8 9 7 Chapter 7 Instrument System Settings Instrument System Settings Chapter 7 ...
Страница 144: ...7 14 Setting the Backlight 138 ...
Страница 284: ...10 14 Measurement Networks 278 ...
Страница 290: ...11 4 Instrument Disposal 284 ...
Страница 320: ...Appendix4 External Dimensions A30 ...
Страница 323: ......
Страница 324: ......
Страница 325: ......
Страница 326: ......