9
T-CONTROL
46
Table 9.1: Operation mode "Screed drying"
Bake out day
Flow set
temperature in
°C
If screed drying gets interrupted, resume
drying as follows:
1
25
Day of interruption
resume from day
2
30
0
– 15
1
3
35
16
16
4
40
17
– 23
17
5
– 12
45
24
– 28
24
13
40
29
29
14
35
15
30
16
25
17
– 23
10
24
30
25
35
26
40
27
45
28
35
29
25
30
0
figure 9.1: Flow must temperature in dependence of the bake out days
at „Screed drying”
F
low
mu
st t
emp
er
atu
re [°
C]
Bake out days
Содержание pelletstar CONDENSATION 10
Страница 1: ...OPERATING INSTRUCTIONS Pellet boiler pelletstar CONDENSATION 10 60 ...
Страница 20: ...8 Temperature manager 20 Fig 8 6 Example temperature manager when time mode without difference ...
Страница 85: ...Annex 15 85 15 ANNEX 15 1 Additional boiler schematic visualization Hydraulic recommendation 1 ...
Страница 86: ...15 Annex 86 Hydraulic recommendation 2 ...
Страница 87: ...Annex 15 87 15 2 Solar module schematic representation Program 1 ...
Страница 88: ...15 Annex 88 Program 2 ...
Страница 89: ...Annex 15 89 Program 3 ...
Страница 90: ...15 Annex 90 Program 4 ...
Страница 91: ...Annex 15 91 Program 5 ...
Страница 92: ...15 Annex 92 Program 6 ...
Страница 93: ...Notes 16 93 16 NOTES ...