11
Maintenance schedule
78
Item
Procedure
Check fault recognition and fault report
Check
if
fault
report
e.g.:
ASH
CONTAINER FAULT is shown
Safety valve
Check safety valve tightness
System pressure
Check system pressure.
Minimum pressure: 1,5 bar (cold)
Maximum pressure: see boiler plate
Fire extinguisher
Check fire extinguisher securing and seal
as well as hose and nozzle (according to
national standard)
Ash storage
Ash has to be stored in a non-flammable,
air tight container till disposal.
Boiler room
Remove flammable materials, except
wood chips or pellets stored in a
appropriate container, from the operating
room
Fire protection
Check structural fire protection and fire
doors (e.g.: self-locking fire door)
Condensate and
flushing water
drainage or lifting
station (if
available)
drain line
Inspection and function control of the
lifting unit and the pump or the
condensate / flushing water drain
For longer drain lines, these must be
checked at regular intervals and, if
necessary, cleaned by the customer.
Otherwise, there may be blockages in the
drainage area as deposits may not be
completely flushed away
Содержание pelletstar CONDENSATION 10
Страница 1: ...OPERATING INSTRUCTIONS Pellet boiler pelletstar CONDENSATION 10 60 ...
Страница 20: ...8 Temperature manager 20 Fig 8 6 Example temperature manager when time mode without difference ...
Страница 85: ...Annex 15 85 15 ANNEX 15 1 Additional boiler schematic visualization Hydraulic recommendation 1 ...
Страница 86: ...15 Annex 86 Hydraulic recommendation 2 ...
Страница 87: ...Annex 15 87 15 2 Solar module schematic representation Program 1 ...
Страница 88: ...15 Annex 88 Program 2 ...
Страница 89: ...Annex 15 89 Program 3 ...
Страница 90: ...15 Annex 90 Program 4 ...
Страница 91: ...Annex 15 91 Program 5 ...
Страница 92: ...15 Annex 92 Program 6 ...
Страница 93: ...Notes 16 93 16 NOTES ...