Maintenance schedule
11
77
Item
Procedure
Pivoting grate
Burning chamber
Check pivoting grate (4) visually for
damages and wear.
Conduct function test of pivoting grate
using the aggregate test
Check ignition pipe, if necessary cleaning
Ash ark
Open the ash tray door by pressing the
cover on the right side. Demount ash
container cover and check ash level and
empty ash container if necessary.
Control -
functioning
Check display, operation and faults list
(see chapter fault reports)
Restart T-Control
Control - faults
Opening the front door or ash door of the
boiler
4
Содержание pelletstar CONDENSATION 10
Страница 1: ...OPERATING INSTRUCTIONS Pellet boiler pelletstar CONDENSATION 10 60 ...
Страница 20: ...8 Temperature manager 20 Fig 8 6 Example temperature manager when time mode without difference ...
Страница 85: ...Annex 15 85 15 ANNEX 15 1 Additional boiler schematic visualization Hydraulic recommendation 1 ...
Страница 86: ...15 Annex 86 Hydraulic recommendation 2 ...
Страница 87: ...Annex 15 87 15 2 Solar module schematic representation Program 1 ...
Страница 88: ...15 Annex 88 Program 2 ...
Страница 89: ...Annex 15 89 Program 3 ...
Страница 90: ...15 Annex 90 Program 4 ...
Страница 91: ...Annex 15 91 Program 5 ...
Страница 92: ...15 Annex 92 Program 6 ...
Страница 93: ...Notes 16 93 16 NOTES ...