background image

S.MAX SERIES  SOLID FUEL BOILER

S.MAX SERIES  SOLID FUEL BOILER

0-S.MAX

REV.01 / 201

0

0036

0036

Содержание S.MAX Series

Страница 1: ...S MAX SERIES SOLID FUEL BOILER S MAX SERIES SOLID FUEL BOILER 0 S MAX REV 01 2010 0036 0036...

Страница 2: ...fire 12 Setting outlet water temperature 13 Stoking 13 Overnight heating mode 13 Removing solid combustion residuals 13 Dewing and tarring 14 Boiler shutdown 14 Short term shutdown 14 Long term shutd...

Страница 3: ...Information on the boiler plate The boiler Serial No is shown on the plate which is attached to the cover panel of the cast iron body 2...

Страница 4: ...Boiler dimensions Boiler packaging dimensions 3...

Страница 5: ...Technical parameters 4...

Страница 6: ...ted equipment 6 The service technician putting the boiler into operation for the first time must show the user the various parts of the boiler and how to control the boiler with the boiler safety elem...

Страница 7: ...d up with ice do not attempt to start up the boiler until normal operating conditions have been restored Ensuring safety of equipment and people The boiler and all accessories complies with the requir...

Страница 8: ...d with necessary pipe sections for water connection It also has brackets for fitting thermostat sensors and brackets on feet for fastening the boiler to the base Attached to the cast iron boiler body...

Страница 9: ...utlet from the boiler cast iron body It detects temperature of the hot water and regulates the supply of primary combustion air to underneath the boiler stoker by opening or shutting a flap situated i...

Страница 10: ...Fig 7 Keep object s away from regulation hatch s front and channels for allowing primary air o t a d c a e s o a o g p a y a transfer Supply of secondary combustion air is controlled by an air rosett...

Страница 11: ...ows the indications for inlet and drain shown on the valve must be followed Maximum temperature of the input water for temperature safety valve is 15 C and minimum water pressure Maximum temperature o...

Страница 12: ...Check Valve 6 Four Way Mixing Valve 7 System Pump 8 Heating System 9 Open Expansion Tank Open type expansion tank must be equipped with the highest level in the entire hydraulic system The expansion...

Страница 13: ...em water at the rate of 15 Please note The failure to meet this requirement may lead to the heat exchanger getting clogged up and the cast iron block may crack as a result During the heating season a...

Страница 14: ...e boiler outlet is controlled Stoking First shut the regulating hatch this will shut supply of combustion air into the boiler Then open the chimney flap completely Partially open the stoking door and...

Страница 15: ...hutting the boiler down clean it remove all combustion residuals empty the ashtray clean the stoking door contact surfaces and the ash compartment and then shut the boiler s stoking door and ash compa...

Страница 16: ...ning and closing Boiler burning room and possible soot layers on smoke channels are checks and cleanings Boiler cleaning Wh th b il i d t d fi h l t th b il ll i l h t h ib Sensor of the pressure test...

Страница 17: ...fig 12 fig 13 fig 14 fig 15 16...

Страница 18: ...eating systems with gauge pressure up to 400 kPa which use water that meets the requirements of related standarts under no circumstances may the water be acidic i e it must have pH 7 and it should hav...

Страница 19: ...om cellar corridor and in habitable rooms The room in which the boiler is located must have a permanent supply of air necessary for the combustion process The air must be free of halogen hydrocarbons...

Страница 20: ...r room and allow manipulations with the boiler such as cleaning and stoking The distance between the front of the boiler and the wall should be at least the boiler length L plus 500 mm Minimum distanc...

Страница 21: ...nto the back section Screw the flue adapter with smoke flap onto the boiler combustion gases outlet Put a flue over the flue adapter and insert it into the chimney connection hole The flue diameter is...

Страница 22: ...SMAX boiler parts fi 18 fig 18 fig 19 21...

Страница 23: ...Spare parts list p p fig 20 22...

Страница 24: ...ss than 300 L Transportation and storage The manufacturer handles the boiler that is on a palette and secured against shifting with screws The boiler may not be transported in a different position tha...

Страница 25: ...arnings A sufficient flue draft of the flue gas system is the basic requirement for the correct functioning of the boiler It fundamentally affects its performance and efficiency Therefore heed the fol...

Страница 26: ...combustion products and the outside atmosphere We recommend the use of a chimney liner Have precise calculations carried out by a heating engineer or flue installer Coefficent 0 041 for wood Coeffice...

Страница 27: ...Address Ikitelli Organize Sanayi Bolgesi Ataturk Bulvari 17 Cad No 5 ISTANBUL TURKEY Phone 90 212 485 48 74 Fax 90 212 485 48 73 Web www rima com tr e mail info rima com tr www onmetal com tr...

Отзывы: