11
Maintenance schedule
80
11.4
Annually inspection (service, notification)
Annually inspection, at least every 3000 operating hours.
Maintenance by manufacturers or certified sales partners
Item
Procedure
Maintenance
Conduct system maintenance by authorised
personnel
Burn back
protection device
(symbolic
representation)
Unscrew revision cover (depending on the
boiler type)
Check BFP flap visually for damages, wear
and tightness
Open BFP flap by using the aggregate test
Position paper strip between hopper flange
and BFP flap and close BFP flap afterwards.
Try to pull out paper strip. If possible, adjust
BFP flap.
Conduct paper strip test at different positions
ID-fan
Unscrew 4x wing nut
Remove and clean ID-fan witch a brush
Содержание pelletstar CONDENSATION 10
Страница 1: ...OPERATING INSTRUCTIONS Pellet boiler pelletstar CONDENSATION 10 60 ...
Страница 20: ...8 Temperature manager 20 Fig 8 6 Example temperature manager when time mode without difference ...
Страница 85: ...Annex 15 85 15 ANNEX 15 1 Additional boiler schematic visualization Hydraulic recommendation 1 ...
Страница 86: ...15 Annex 86 Hydraulic recommendation 2 ...
Страница 87: ...Annex 15 87 15 2 Solar module schematic representation Program 1 ...
Страница 88: ...15 Annex 88 Program 2 ...
Страница 89: ...Annex 15 89 Program 3 ...
Страница 90: ...15 Annex 90 Program 4 ...
Страница 91: ...Annex 15 91 Program 5 ...
Страница 92: ...15 Annex 92 Program 6 ...
Страница 93: ...Notes 16 93 16 NOTES ...