7
Heat & Glo • REVO-V12, REVO-S21, REVO-H31 Installation Manual • 2273-980 Rev. J • 5/15
D. Installation Methods:On-Wall or In-Wall
When installing the REVO model, you may choose from one of two installation options.
1. On-Wall Installation:
The REVO can hang on a sheet rock/combustible wall
2. In-Wall Installation:
The REVO can be partially recessed into a wall using the In-Wall Tub Assembly
The On-Wall installation is the most common and least difficult method. On-Wall installation information is located in Sec
-
tions 3, 6, and 10. In-Wall installation information is isolated in Section 11. Section 11 will discuss preparation, clearances
and finishing specific to the In-Wall method. Consult the table of contents for topics common to both methods, such as vent
configurations, gas and electrical information.
On-Wall Installation
In-Wall Installation
The REVO can hang on a sheet rock/combustible wall.
See Sections 3, 6 and 10 for On-Wall installation
information.
The REVO can be partially recess into a wall using
the In-Wall Kit. See Service Parts section in Owner’s
Manual and contact your dealer to order. See Section
11 for installation information.
FRAMING
F SHEETROCK
MATERIAL CAN BE
COMBUSTIBLE
I.E. SHEETROCK
F SHEETROCK
+ APPLIANCE OUTER WRAP
F SHEETROCK
+ APPLIANCE OUTER WRAP + HOLE CUT
CUT OUT MATERIAL
FOR VENT
APPLIANCE
OUTER WRAP
APPLIANCE
OUTER WRAP
7-5/16 IN.
SIDE VIEW
(DECORATIVE FRONT INSTALLED)
FINISHED INSTALLATION
TOP VIEW
TOP VIEW WITH
TUB INSTALLED
VERTICAL
2 X 6 STUDS
2 X 6 HEADER
TUB ASSEMBLY
TUB ASSEMBLY
INSULATION ZONE
BEFORE
AFTER
3-1/2 IN.
2 IN.
NON-COMBUSTIBLE
BOARD
SHEETROCK/COMBUSTIBLE
FACING MATERIAL
RECESSED
IN-WALL TUB
4-13/16 IN.
SIDE VIEW
(DECORATIVE FRONT INSTALLED)
FRAMING
APPLIANCE
INSTALLED
4 IN. TO
FINISHED
FLOOR
NON-COMBUSTIBLE
BOARD
F IN-WALL TUB
+ APPLIANCE
Figure 2.1 On-Wall Installation Method
Figure 2.2 In-Wall Installation Method