Heat & Glo • REVO-V12, REVO-S21, REVO-H31 Installation Manual • 2273-980 Rev. J • 5/15
58
TOP VIEW
TOP VIEW WITH
TUB INSTALLED
VERTICAL
2 X 6 STUDS
2 X 6 HEADER
TUB ASSEMBLY
TUB ASSEMBLY
INSULATION ZONE
BEFORE
AFTER
3-1/2 IN.
2 IN.
Figure 11.6. In-Wall Tub Installation - Top View
A
D
V12
20-1/8 in.
43-7/8 in.
S21
29-3/8 in.
41-1/4 in.
H31
39-3/8 in.
39-3/4 in.
C =4 IN. MIN.
A
D
*3/4 IN. MIN.
TOP
1-1/2 IN.
FINISHED FLOOR
* = 3/4 IN. OF STUD IS
EXPOSED FOR
MOUNTING 1/2 INCH
NON-COMBUSTIBLE
BOARD
WALL - FRAMED AND SHEETROCKED
SHEET ROCK
1/2 INCH MAX.
THICKNESS
NON-COMBUSTIBLE
BOARD
NON-COMBUSTIBLE
BOARD
Figure 11.7. In-Wall Tub Installation - Sheet Rock Facing
B. In-Wall - Minimum Combustible Facing
Clearances
1/2 IN. MAX.
THICKNESS
Figure 11.8. In-Wall Tub Installation - Sheet Rock Thickness
NOTICE:
The In-Wall application is not compatible with
the Radius decorative front.
HOOD CLIP DETAIL
FINISHING STRIPS
PROPER INSTALLATION OF HOOD CLIPS
(VIEW SHOWN WITHOUT FINISHING STRIPS)
(VIEW SHOWN WITH
FINISHING STRIPS)
Figure 11.5 Finishing Strip Attachment & Proper Hood Clip
Installation
18. Have a qualified service technician make the connec
-
tions to gas and electric service.
WARNING! Risk of Fire or Explosion!
Gas and electric
connections should be performed by a qualified service
technician.
19. Gas line holes and other openings should be caulked
or sealed.