✓
coil (1) with switchable 24 VDC power
supply and AMP Superseals connector is
energized.
✓
Piston rod (2) fully extended.
4. Disconnect 24 VDC power supply and AMP Superseals connector from locking unit.
Nitrogen supply
1. Connect nitrogen controller to your
nitrogen bottle.
2. Make sure that the discharge
throttles (2) on the controller are
shut.
3. Open the nitrogen bottle's valve (1).
4. Set the nitrogen controller to the
pressure P1 of your locking unit in
accordance with the technical data
sheet.
5. Watch the pressure on the nitrogen
controller’s pressure gage (3).
50/63
B 6052-21 -
11
-2021 - 1.7
HAWE Hydraulik SE