3-16
888-2685-001
12/24/07
WARNING: Disconnect primary power prior to servicing.
Ranger Commissioning Manual
Section 3 Operation and Adjustments
b.
Output Power Meters - This panel gives the Forward and reflected power outputs
both before and after the built-in mask filter.
c.
Output Control - This area of the screen can be used to control an external motor-
ized RF switch so that the transmitter can be switched from Antenna to the Test
Load, provided the System Configuration screen in Figure 3-23 on page 3-28 is
set for “Motor”. For systems with a manual patch panel the System Configuration
screen should be set to “Manual”. It also reads out the position of an RF switch or
a 3-port patch panel, based on micro-switches located on the switch or panel.
Lastly, it shows the condition of the Test Load interlock. The test load interlock
will not affect transmitter operation if the switch is in the antenna position.
NOTE:
If the load interlock (also called the RF Mute Interlock) is open and the transmit-
ter is switched to the “Test Load” position, the transmitter output will be muted.
If a test load interlock is not used the appropriate connection on the External I/O
board must be jumpered. For more information see "2.7 Interlock Connections"
on page 2-7.
Содержание CZ1000F
Страница 4: ...888 2685 001 12 24 07 WARNING Disconnect primary power prior to servicing MRH 2...
Страница 5: ...12 24 07 888 2685 001 WARNING Disconnect primary power prior to servicing...
Страница 7: ......
Страница 9: ...12 24 07 888 2685 001 WARNING Disconnect primary power prior to servicing...
Страница 11: ......
Страница 12: ...888 2685 001 12 24 07 WARNING Disconnect primary power prior to servicing...
Страница 16: ...Table of Contents continued 4 888 2685 001 12 24 07 WARNING Disconnect primary power prior to servicing...