Chapter 15 Maintenance
181
Chapter 15
Maintenance
15.1
Inspection Items and Periods
Periodic inspections are required to maintain the robot in the best condition for a long
period of time. An inspector should prepare and execute an inspection plan.
The following items require periodic inspections. If you found some problems during
inspections, and you can resolve them on your own, contact Hanwha Precision
Machinery Co.
Inspection item
What to inspect
Periods
Robot
arm
All
Check if the robot moves to the desired
destination according to the program.
Daily
All
Remove stains, dusts and pollutants.
3 months
All
Check if the robot arm or tool sags when you
turn on/off the servo power.
Daily
Main
bolts
Check if the bolts exposed to the outside of
the robot is loose.
3 months
Motor
Check for abnormal heat generation or
noises.
Daily
Controller
Cable
Check the cable connections.
6 months
Internal
Remove dusts from the inside.
Filter
Remove dusts from the filter.
Содержание HCR-5
Страница 1: ...HCR 5 Collaborative Robot User Manual Aug 2019 V 2 001 ...
Страница 2: ......
Страница 14: ......
Страница 96: ...Chapter 8 Safety Settings 96 ...
Страница 101: ...Chapter 8 Safety Settings 101 3 Press the OK button ...
Страница 177: ...Chapter 12 Device Settings 177 B When the scanning location and the robot s location are shifted by X ...
Страница 188: ...Chapter 15 Maintenance 188 4 When the confirmation window appears press YES ...
Страница 192: ...192 Appendix B Certification Safety ...
Страница 193: ...193 ...
Страница 194: ...194 MD Machinery Directive ...
Страница 195: ...195 LVD Low Voltage Directive ...
Страница 196: ...196 EMC Electro Magnetic Compatibility ...
Страница 197: ...197 Cleanroom Body ...
Страница 198: ...198 Cleanroom Controller ...
Страница 199: ...199 Appendix C Dimensions for Installation ...
Страница 200: ...200 Appendix D Tool Flange Cross Section The tool flange is designed suitable for ISO9409 1 50 4 M6 ...
Страница 205: ......