57
Circuit joint looseness
condition
○
○
○
Steering
indicator
light
Work and installation
condition
○
○
○
○
○
Horn
Work and installation
condition
○
○
○
○
○
Light and
bulb
Work and installation
condition
○
○
○
○
○
Reversing
buzzer
Work and installation
condition
○
○
○
○
○
Instrument
Instrument
working
condition
○
○
○
○
○
Lifting system periodical maintenance schedule
Check
item
Service required
Tools
Daily
(8 hrs)
Monthly
(166hrs)
3months
(500hrs)
Semi-annual
(1000hrs)
Annual
(2000hrs)
Chain,
chain
wheel
Check chain tensity, if
transform, damage or
rust.
○
○
○
○
○
Add oil to the chain
○
○
○
○
Riveting
pin
and
looseness
○
○
○
○
Chain deformation and
damage.
○
○
○
○
If chain bearing loosen.
○
○
○
○
Attachm
ent
Check if conditon is
normal
○
○
○
○
Lifting
cylinder
Check if piston rod,
piston rod thread and
connection
deform,
loosen or damage.
Test
hammer
○
○
○
○
○
Operation condition
○
○
○
○
○
Leakage condition
○
○
○
○
○
Pin
and
cylinder
steel-backed
bearing
wear
or
damage
condition.
○
○
○
○
Hydraulic
pump
If hydraulic pump leaks
or has noise.
○
○
○
○
○
Hydraulic pump drive
gear wear condition
○
○
○
○
Fork
Fork
damage,
deformation and wear
condition.
○
○
○
○
○
Positioning pin wear
and damage condition.
○
○
○
Содержание XF Series
Страница 127: ...123 pipes IMPCO single fuel system 120...
Страница 128: ...124 LPG system drawing...
Страница 141: ...137 XVI Maintenance record Date Item of maintenance Signature Remark...